Storage (Duration 2h)

3 unique locations (9 components)

Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
27.15 MW
Land north of Indian Queens Substation, Domellick Hill (B3279), St Dennis, St Austell, Cornwall, PL26 8BY (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)

Active • 2026-27 (T-4), 2025-26 (T-1)
19.56 MW
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
22.99 MW
Loading map...
Showing 3 locations