82 unique locations (245 components) - Page 1 of 4

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (3 components)
• Two hour duration battery storage (2)
• Two duration battery storage
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.56 MW
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (4 components)
• Existing CMU comprising of battery storage and associated plant (2)
• New Build CMU comprising of battery storage and associated plant
Storage (Duration 2h) CONRAD (WINCHESTER) LIMITED New Build Generating CMU Winchester Winchester +2 more SO21
Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.26 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (3 components)
• New build 49.995MW / 99.990 MWh battery energy storage system. (2)
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared grid connection.
Active • 2027-28 (T-4), 2025-26 (T-1)
14.67 MW
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
• CMU ID 22NEW4, a new build battery storage CMU
• CMU ID 23NEW1, a new build battery storage CMU
• CMU ID 24NEW1, a new build battery storage CMU
Storage (Duration 2h) FIELD NEWPORT LTD New Build Generating CMU Field Newport Field Newport +2 more NP19
Active • 2026-27 (T-4), 2025-26 (T-1) ...
20.04 MW
Tredington Fields Farm, Claydon Solar B, Tredington, Tewkesbury, GL20 7BS (2 components)

Battery Storage (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
3.46 MW
Titchfield Lane, Wickham, Fareham PO15 6DY (3 components)

CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System) (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
32.54 MW
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (4 components)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. (2)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is currently in construction and due to be operational in Q4 ?23.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
19.62 MW
The Wagon Hovel, The Borrows, Sibthorpe, Newark, NG23 5LU (1 component)

A 2 hour BESS connecting directly to the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 4 Not Prequalified NG23
Active • 2025-26 (T-1)
0.26 MW
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (5 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Storage (Duration 2h) CONRAD (SWINDON) LIMITED New Build Generating CMU Swindon Swindon +2 more SN3
Active • 2027-28 (T-4), 2025-26 (T-1) ...
10.59 MW
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (2 components)
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14MW, located in Buxton
Storage (Duration 2h) R&S ENERGY LIMITED New Build Generating CMU Waterswallows BESS Waterswallows BESS SK17
Active • 2025-26 (T-1), 2024-25 (T-1)
6.34 MW
Smithyard Lane, Watchet, TA4 4NN (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD (WATCHET) LIMITED New Build Generating CMU Watchet TA4
Active • 2025-26 (T-1)
3.22 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (5 components)
• 50MW of BESS to be installed within a future Greener Grid Park. (2)
• BESS project to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
40.07 MW
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.76 MW
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 003 LIMITED New Build Generating CMU Royle Barn Road Royle Barn Road +3 more Not Prequalified OL11
Active • 2026-27 (T-4), 2025-26 (T-1) ...
28.13 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
• A New Build battery energy storage system. (2)
• An existing battery energy storage system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
42.89 MW
Pikevy Farm, Glenrothes, Fife, KY6 3HD (2 components)

This is a 49.9MW battery storage facility connected at 33kV. (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
20.72 MW
Park Farm Solar and Battery, Shaftesbury Road, Gillingham, SP8 5JG (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site (2)

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Shaftesbury BESS Shaftesbury BESS SP8
Active • 2027-28 (T-4), 2025-26 (T-1)
7.09 MW
Overhill Farm, Rothienorman, Scotland, AB51 8YN (2 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2.5 hours.
Active • 2027-28 (T-4), 2025-26 (T-1)
23.40 MW
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (4 components)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in NGED's South West region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
Storage (Duration 2h) ECOTRICITY (SMART GRID) LIMITED New Build Generating CMU Alveston 10MW Battery Storage Alveston 10MW Battery Storage +1 more BS35
Active • 2026-27 (T-4), 2025-26 (T-1) ...
10.98 MW
North Tawton, Sampford Courtenay, West Devon, Devon, England, EX20 2DA, United Kingdom (3 components)

30MW/30MWh one hour battery (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.49 MW
Netherton Farm, Keith AB55 5PE (14 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• Lithium ion battery storage plant
Storage (Duration 2h) Storage (Duration 4h) ZENOBE BLACKHILLOCK LIMITED New Build Generating CMU Blackhillock Blackhillock +2 more AB55
Active • 2026-27 (T-4), 2025-26 (T-1) ...
169.83 MW
Land west of Roman Camp Road, Calderwood Broxburn West Lothian EH52 5PF (1 component)

Standalone battery storage system connecting at 33kV to the Broxburn substation

Storage (Duration 2h) BROXBURN ENERGY STORAGE LIMITED New Build Generating CMU Broxburn EH52
Active • 2025-26 (T-1)
12.90 MW
Land To The West Of Meardsall Lane,, Swinderby,, North Kesteven, LN6 9JA (1 component)

A standalone 2 hour BESS connecting directly onto the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 3 Not Prequalified LN6
Active • 2025-26 (T-1)
0.26 MW
Land to the Westfield Farm, Town Street, Westborough, Newark, NG23 5HG (1 component)

A 2 hour BESS connecting directly to the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 4 Not Prequalified NG23
Active • 2025-26 (T-1)
0.26 MW