Storage (Duration 2h)

116 unique locations (755 components) - Page 1 of 5

West Marsh Road Spalding Lincolnshire PE11 3BB (14 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Unit 23, Cocker Avenue, Poulton Industrial Estate, FY6 8JU (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2025-26 (T-4)
Unit 1, Brindley Close, Cheney Manor Industrial Estate, Swindon, SN2 2YW (3 components)

12MW 24MWh battery storage located at Brindley Close in Swindon (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A gas fuelled generating station (2)
• A Battery Energy Storage System
Active • 2025-26 (T-4), 2024-25 (T-1)
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is … (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
the land to the south west of Middleton Road, Middleton, Morecambe extending to approximately 3 acres (1 component)

75.00 MW of Battery Energy Storage Units with associated infrastructure.

Active • 2025-26 (T-4)
The Hollies Croft Skegness Lincolnshire PE24 4SH (1 component)

20MW-40MWh Battery Energy Storage system. Number of Inverters/skid: 6 x 3950kVA UP-XT/MVPS 4600S2 @ 25C Number of Electric combiner Box: 12 Number of battery box: 24

Active • 2025-26 (T-4)
The Common, Malmesbury, SN16 9RJ (2 components)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Active • 2026-27 (T-4), 2025-26 (T-4)
7.08 MW
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (9 components)

Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH. (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Speke Hall Avenue, Speke, Liverpool, L24 8DA (3 components)
• A new build, battery energy storage system (2)
• A new build, gas fueled generation station.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.47 MW
South of Carnegie Road, Liverpool, L13 3AT (1 component)

New build battery storage

Active • 2025-26 (T-4)
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (6 components)
• 50MW of BESS to be installed within a future Greener Grid Park. (2)
• BESS project to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
37.96 MW
Scawby Brook, Brigg, Lincolnshire, DN20 9LT. (3 components)

Brigg Battery 2 hour duration (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.78 MW
Salisbury BESS, The Avenue, Salisbury, Wiltshire, South West England, England, SP2 0BU, United Kingdom (2 components)
• The CMU is a Battery Energy Storage System with a planned 49.5MW active power output, consisting of containerised batteries.
• The CMU is a Battery Energy Storage System with a planned 49.9MW active power output, consisting of containerised batteries.
Active • 2025-26 (T-4), 2024-25 (T-1)
RWE Generation UK plc, Cheshire Power Station North Road, Ellesmere Port Cheshire CH65 1AF (2 components)

The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel. (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
3.55 MW
Rusholme Grange, Drax, YO8 8PW (4 components)
• New build 35MW Battery Energy Storage System (2)
• Lithium-ion Battery Energy Storage System
Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.96 MW
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.13 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Gas CHP on South bank of river Humber providing electricity and industrial steam (2)
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Gas CHP on South bank of river Humber providing electricity and industrial steam (4)
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.02 MW
Overlea Farm , New Mills, High Peak, Stockport SK22 4QJ (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Ordsall Lane, Ordsall, Salford Quays, Salford, M5 3NB (2 components)

A Battery Energy Storage System

Active • 2025-26 (T-4)
North of Hull Rd, Osbaldwick, York,YO10 3JA (2 components)

New build battery storage.

Active • 2025-26 (T-4)
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT (6 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2026-27 (T-4), 2025-26 (T-4)
6.29 MW
Loading map...
Showing 25 locations