Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

176 unique locations (682 components) - Page 1 of 8

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (4 components)
• Existing CMU comprising of battery storage and associated plant (2)
• New Build CMU comprising of battery storage and associated plant
Storage (Duration 2h) CONRAD (WINCHESTER) LIMITED New Build Generating CMU Winchester Winchester +2 more SO21
Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.26 MW
West of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Sellindge Not Prequalified TN25
Active • 2026-27 (T-4)
8.03 MW
West of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Landulph Not Prequalified PL12
Active • 2026-27 (T-4)
8.98 MW
Welwyn Power, Tewin Road, Welwyn Garden City, AL7 1BH (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Welwyn Power Not Prequalified AL7
Active • 2026-27 (T-4)
1.18 MW
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment. (2)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Reciprocating engines Storage (Duration 2h) STOR 108 LTD HAMILTON LANE POWER LIMITED New Build Generating CMU Hamilton Hamilton +3 more OL4
Active • 2026-27 (T-4), 2024-25 (T-1) ...
25.00 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
• CMU ID 22NEW4, a new build battery storage CMU
• CMU ID 23NEW1, a new build battery storage CMU
• CMU ID 24NEW1, a new build battery storage CMU
Storage (Duration 2h) FIELD NEWPORT LTD New Build Generating CMU Field Newport Field Newport +2 more NP19
Active • 2026-27 (T-4), 2025-26 (T-1) ...
20.04 MW
The Manorway, Stanford-le-Hope, SS17 9LL (3 components)
• A Battery Energy Storage System (2)
• Reciprocating engines of 6 mW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.74 MW
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is … (3)

Storage (Duration 2h) Open Cycle Gas Turbine (OCGT) GATEWAY ENERGY CENTRE LIMITED New Build Generating CMU Gateway Energy Centre Limited Gateway Energy Centre Limited +9 more SS17
Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
The Common, Malmesbury, SN16 9RJ (2 components)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Storage (Duration 1h) Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Malmesbury Malmesbury Not Prequalified SN16
Active • 2026-27 (T-4), 2025-26 (T-4)
7.08 MW
Tees Dock Road Redcar and Cleveland Tees Valley England TS6 7AB (1 component)

A new build 100MW/200MWh battery storage facility connected to the Transmission network, located in Teesworks, Redcar

Storage (Duration 2h) SOUTH TEES ENERGY STORAGE LTD New Build Generating CMU South Tees BESS Not Prequalified TS6
Active • 2026-27 (T-4)
23.04 MW
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JP (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.

Storage (Duration 2h) R&S ENERGY LIMITED New Build Generating CMU Waterswallows BESS SK17
Active • 2026-27 (T-4)
2.20 MW
Stobhill Hospital, Fife Way, Balgrayhill, Glasgow, Glasgow City, Scotland, G21 3UW (1 component)

60MW / 120MWh BESS

Storage (Duration 2h) BLUESTONE ENERGY LTD New Build Generating CMU STOBHILL Not Prequalified G21
Active • 2026-27 (T-4)
14.18 MW
Steam Lane, Avonmouth industrial Estate, Bristol, BS11 0YT (2 components)

20 x 1.1MWh battery modules connected to provide 10MW max instantaneous output and 20MWh energy output per day. All batteries are class [XX]. (2)

Storage (Duration 2h) AVILS CONSULTING LIMITED New Build Generating CMU Rejected BS11
Active • 2026-27 (T-4), 2023-24 (T-1)
6.05 MW
Stanely WWTW, Gleniffer Rd, Paisley, PA2 8UE (1 component)

60MW/120MWh BESS

Storage (Duration 2h) BLUESTONE ENERGY LTD New Build Generating CMU STANLEY WATER Not Prequalified PA2
Active • 2026-27 (T-4)
14.18 MW
South West side of the A444, Castle Gresley, DE11 9ES (1 component)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Active • 2026-27 (T-4)
3.13 MW
SOUTH OF NATIONAL GRID IVER SUBSTATION, SLOUGH ROAD, IVER HEATH UB8 2FX (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Iver Not Prequalified UB8
Active • 2026-27 (T-4)
7.56 MW
Southmoor Lane, Havant, Hampshire, PO9 1JW (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Havant Not Prequalified PO9
Active • 2026-27 (T-4)
7.09 MW
South Fambridge Hall Solar Farm Fambridge Road, South Fambridge, Rochford, SS4 3LS (1 component)

20MW/40MWh of Lithium Iron Battery Electric Storage System, comprising 6 storage containers, and associated metering, switchgear and electrical infrastructure. the Battery will be its own BMU and will be co-located …

Storage (Duration 2h) SOUTH FAMBRIDGE HALL SOLAR PARK LIMITED New Build Generating CMU South Fambridge Hall Solar Park Rejected SS4
Active • 2026-27 (T-4)
4.61 MW
South East of Norwich Substation, Ipswich Road, Stoke Holy Cross, South Norfolk, Norfolk, England, NR14 8PQ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Norwich Not Prequalified NR14
Active • 2026-27 (T-4)
8.98 MW
Smithyard Lane, Williton, TA4 4NN (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Watchet Watchet Not Prequalified TA4
Active • 2026-27 (T-4), 2023-24 (T-1)
7.88 MW
Slack Lane, Westhoughton, BL5 3QH (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Bolton B Not Prequalified BL5
Active • 2026-27 (T-4)
4.25 MW
Slack Lane, Westhoughton, BL5 3LB (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Bolton A Not Prequalified BL5
Active • 2026-27 (T-4)
2.13 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (5 components)
• 50MW of BESS to be installed within a future Greener Grid Park. (2)
• BESS project to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
40.07 MW
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.76 MW
Loading map...
Showing 25 locations