Storage (Duration 2h)

1 unique locations (2 components)

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (2 components)

The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries. (2)

Storage (Duration 2h) SSE BATTERY MONK FRYSTON LIMITED SSE UTILITY SOLUTIONS LIMITED New Build Generating CMU Monk Fryston BESS Phase 1 Monk Fryston BESS Phase 1 LS25
Active • 2027-28 (T-4), 2026-27 (T-4)
107.63 MW