Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

11 unique locations (16 components)

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
lLand off Lincomb Lane, Lincomb, Stourport On Severn, DY13 9RB (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU WORCESTER091 Rejected DY13
Active • 2028-29 (T-4)
20.73 MW
Land West Of Slack Lane, Westhoughton, Bolton, BL5 3LB (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Bolton088 BL5
Active • 2028-29 (T-4)
6.28 MW
Land West Of Slack Lane, Westhoughton, Bolton BL5 3LB (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Bolton096 Not Prequalified BL5
Active • 2028-29 (T-4)
3.14 MW
Land West Of Kegworth Road, Ratcliffe On Soar, Nottinghamshire,NG11 0EA (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU RATCLIFFE093 Rejected NG11
Active • 2028-29 (T-4)
20.92 MW
Land to the north of Stoke Lane, Norwich, NR14 8QD (3 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.
Storage (Duration 2h) FLEXION ENERGY SPV 2 LTD FPC ELECTRIC LAND LIMITED New Build Generating CMU Norwich B1 Norwich B1 +1 more Rejected NR14
Active • 2028-29 (T-4), 2026-27 (T-4)
34.73 MW
Land off Sir William Smith Road, Kirkton Industrial Estate, D11 3RD (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU ARBROATH092 Rejected D11
Active • 2028-29 (T-4)
10.47 MW
Land Off Severn Road Hallen Bristol South Gloucestershire BS10 7SE (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU AVONMOUTH094 Rejected BS10
Active • 2028-29 (T-4)
14.66 MW
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (4 components)
• Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU KEMSLEY089 Kemsley B1 +2 more Rejected ME10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
67.74 MW
Land North Of Stoke Lane Dunston Norfolk, NR14 8QD (1 component)

" Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration"

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Norwich2 Rejected NR14
Active • 2028-29 (T-4)
14.66 MW
Burton Enterprise Park Hawkins Lane Burton upon Trent Staffordshire DE14 1QG (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU BURTON086 DE14
Active • 2028-29 (T-4)
5.24 MW
165 Fordhouse Lane Stirchley Birmingham B30 3AG (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Stirchley Rejected B30
Active • 2028-29 (T-4)
4.19 MW
Loading map...
Showing 11 locations