Storage (Duration 2h)

154 unique locations (563 components) - Page 1 of 7

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Wright Street, Paisley, Renfrew, PA4 8AN (1 component)

Battery Energy Storage, 49.990 MW installed for a 2hr system.

Active • 2028-29 (T-4)
10.47 MW
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (3 components)
• Two hour duration battery storage (2)
• Two duration battery storage
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.56 MW
Withy Place, Bramley Road, Silchester, Reading, RG7 2LN (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) ROOT-POWER (SOUTH) LIMITED New Build Generating CMU Withy Place Not Prequalified RG7
Active • 2028-29 (T-4)
10.47 MW
West House Farm, Scruton, Northallerton, DL7 0RQ (1 component)

18MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured …

Storage (Duration 2h) LEEMING SOLAR FARM LIMITED New Build Generating CMU Leeming Solar Farm BESS DL7
Active • 2028-29 (T-4)
3.77 MW
Westfield Road, Carlton, Wakefield, WF3 3RJ (1 component)

Battery energy storage system

Storage (Duration 2h) FVS WESTFIELD ROAD LTD New Build Generating CMU WESTFIELD ROAD BESS Not Prequalified WF3
Active • 2028-29 (T-4)
10.45 MW
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (2 components)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Wadsworth Wadsworth 2 Rejected DL14
Active • 2028-29 (T-4)
31.34 MW
Uskmouth Power Station, West Nash Road, Newport, NP18 2BZ (2 components)

115MW battery energy storage system on a shared transmission connection

Active • 2028-29 (T-4)
16.12 MW
Uskmouth Power Station West Nash Road, Nash, Newport, Wales, NP18 2BZ (1 component)

AW1 Energy Storage Limited (AW1) will develop a Battery Energy Storage System (BESS) at land adjacent to the substation and will initially develop a 120 MW / 240 MWh BESS …

Storage (Duration 2h) AW1 ENERGY STORAGE LIMITED New Build Generating CMU Afon Wysg 1 NP18
Active • 2028-29 (T-4)
20.10 MW
Todrig Farm Coldstream TD12 4JA (5 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and … (2)

Storage (Duration 2h) ECCLES ENERGY CENTRE LIMITED New Build Generating CMU Eccles Energy Centre Limited Eccles Energy Centre Limited TD12
Active • 2028-29 (T-4), 2027-28 (T-4)
148.15 MW
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (4 components)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. (2)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is currently in construction and due to be operational in Q4 ?23.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
19.62 MW
Tillingdown Lane, Caterham, CR3 7JA (2 components)
• A 12MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) ROOT-POWER (SOUTH) LIMITED New Build Generating CMU Tillingdown Tillingdown 2 Rejected CR3
Active • 2028-29 (T-4)
7.52 MW
The fields close to the Land at Little Hale Drove, Sleaford, NG34 9BG, United Kingdom (1 component)

LHBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

Storage (Duration 2h) AGR SOLAR 3 LIMITED New Build Generating CMU Not Prequalified NG34
Active • 2028-29 (T-4)
6.28 MW
The fields close to The Cottage, The Priory, Priory Lane, Little Wymondley, Hitchin, SG4 7HD (1 component)

WYBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

Storage (Duration 2h) AGR SOLAR 4 LIMITED New Build Generating CMU SG4
Active • 2028-29 (T-4)
6.28 MW
Templeton Farm, Birkhill, Dundee, Scotland. DD3 0QH (1 component)

A 2-hour duration containerized battery

Active • 2028-29 (T-4)
5.86 MW
St Philips energy storage facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD (ST PHILIPS) LIMITED New Build Generating CMU St Philips St Philips BS2
Active • 2028-29 (T-4), 2027-28 (T-4)
1.84 MW
St Owens Cross, Peterstow, Hereford, HR9 6AU (1 component)

A lithium-ion Energy Storage Plant

Storage (Duration 2h) ST OWENS CROSS BATTERY STORAGE LIMITED New Build Generating CMU Not Prequalified HR9
Active • 2028-29 (T-4)
7.18 MW
Speke Hall Avenue, Speke, Liverpool, L24 8DA (3 components)
• A new build, battery energy storage system (2)
• A new build, gas fueled generation station.
Reciprocating engines Storage (Duration 2h) BERYL STREET GENERATION LIMITED BAKER STREET GENERATION LIMITED New Build Generating CMU Speke BESS Speke BESS +1 more Not Prequalified L24
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.47 MW
Slack Lane, Bolton, Greater Manchester, BL5 3LJ (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Bolton A Bolton A Not Prequalified BL5
Active • 2028-29 (T-4), 2027-28 (T-4)
4.01 MW
Site at Whitehill Farm, Coatbridge Road, Gartosh, G69 8DT, United Kingdom (1 component)

New build battery storage

Storage (Duration 2h) WHITEHILL BATTERY STORAGE LIMITED New Build Generating CMU Not Prequalified G69
Active • 2028-29 (T-4)
41.88 MW
Site at Raiths Industrial Estate, Kirkton Drive, Dice, Aberdeen, AB21 0BG (1 component)

New build battery storage

Storage (Duration 2h) DYCE BATTERY STORAGE LIMITED New Build Generating CMU Not Prequalified AB21
Active • 2028-29 (T-4)
10.45 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (5 components)
• 50MW of BESS to be installed within a future Greener Grid Park. (2)
• BESS project to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
40.07 MW
Selby, North Yorkshire, YO8 6PG (2 components)
• A 40MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Greenacres Greenacres 2 YO8
Active • 2028-29 (T-4)
25.07 MW
Scawby Brook, Brigg, Lincolnshire, DN20 9LT. (3 components)

Brigg Battery 2 hour duration (3)

Storage (Duration 2h) CBS ENERGY STORAGE ASSETS UK LIMITED New Build Generating CMU 7RES31 7RES31 DN20
Active • 2028-29 (T-4), 2025-26 (T-4) ...
21.09 MW
Sanquhar II, Sanquhar, Dumfries and Galloway. DG4 6LJ (1 component)

New Build Generation CMU - Battery Energy Storage System.

Storage (Duration 2h) SANQUHAR II COMMUNITY BATTERY COMPANY LIMITED New Build Generating CMU Not Prequalified DG4
Active • 2028-29 (T-4)
18.22 MW
Ryton Industrial Estate Blaydon NE21 4NT (1 component)

2 hour containerised battery storage

Storage (Duration 2h) CAPELLA BESS LTD New Build Generating CMU Capella NE21
Active • 2028-29 (T-4)
10.47 MW