Storage (Duration 2h)

159 unique locations (701 components) - Page 1 of 7

Wright Street, Paisley, Renfrew, PA4 8AN (1 component)

Battery Energy Storage, 49.990 MW installed for a 2hr system.

Active • 2028-29 (T-4)
10.47 MW
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (3 components)
• Two hour duration battery storage (2)
• Two duration battery storage
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.56 MW
Withy Place, Bramley Road, Silchester, Reading, RG7 2LN (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
10.47 MW
West House Farm, Scruton, Northallerton, DL7 0RQ (1 component)

18MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured …

Active • 2028-29 (T-4)
3.77 MW
Westfield Road, Carlton, Wakefield, WF3 3RJ (1 component)

Battery energy storage system

Active • 2028-29 (T-4)
10.45 MW
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (2 components)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
31.34 MW
Uskmouth Power Station, West Nash Road, Newport, NP18 2BZ (2 components)

115MW battery energy storage system on a shared transmission connection

Active • 2028-29 (T-4)
16.12 MW
Uskmouth Power Station West Nash Road, Nash, Newport, Wales, NP18 2BZ (1 component)

AW1 Energy Storage Limited (AW1) will develop a Battery Energy Storage System (BESS) at land adjacent to the substation and will initially develop a 120 MW / 240 MWh BESS …

Active • 2028-29 (T-4)
20.10 MW
Todrig Farm Coldstream TD12 4JA (5 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and … (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
148.15 MW
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (4 components)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. (2)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.18 MW
Tillingdown Lane, Caterham, CR3 7JA (2 components)
• A 12MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
7.52 MW
The fields close to the Land at Little Hale Drove, Sleaford, NG34 9BG, United Kingdom (1 component)

LHBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

Active • 2028-29 (T-4)
6.28 MW
The fields close to The Cottage, The Priory, Priory Lane, Little Wymondley, Hitchin, SG4 7HD (1 component)

WYBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

Active • 2028-29 (T-4)
6.28 MW
Templeton Farm, Birkhill, Dundee, Scotland. DD3 0QH (1 component)

A 2-hour duration containerized battery

Active • 2028-29 (T-4)
5.86 MW
St Philips energy storage facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
1.84 MW
St Owens Cross, Peterstow, Hereford, HR9 6AU (1 component)

A lithium-ion Energy Storage Plant

Active • 2028-29 (T-4)
7.18 MW
Speke Hall Avenue, Speke, Liverpool, L24 8DA (3 components)
• A new build, battery energy storage system (2)
• A new build, gas fueled generation station.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.47 MW
Slack Lane, Bolton, Greater Manchester, BL5 3LJ (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
4.01 MW
41.88 MW
10.45 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (6 components)
• 50MW of BESS to be installed within a future Greener Grid Park. (2)
• BESS project to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
37.96 MW
Selby, North Yorkshire, YO8 6PG (2 components)
• A 40MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
25.07 MW
Scawby Brook, Brigg, Lincolnshire, DN20 9LT. (3 components)

Brigg Battery 2 hour duration (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.78 MW
Sanquhar II, Sanquhar, Dumfries and Galloway. DG4 6LJ (1 component)

New Build Generation CMU - Battery Energy Storage System.

Active • 2028-29 (T-4)
18.22 MW
Ryton Industrial Estate Blaydon NE21 4NT (1 component)

2 hour containerised battery storage

Active • 2028-29 (T-4)
10.47 MW