Storage (Duration 2h)

4 unique locations (158 components)

EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2472.54 MW
Norrington Gate Farm, Norrington Gate, Broughton Gifford, Melksham, SN12 8LW (2 components)
• 1 x 2MW gas gen sets at Markham Lane
• A Battery Energy Storage System
Active • 2026-27 (T-4), 2020-21 (T-4)
35.45 MW
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (10 components)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
• Gas reciprocating engines.
Active • 2024-25 (T-1), 2023-24 (T-4) ...
34.08 MW
Toray 2 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (4 components)
• CMU consisting of multiple reciprocating engines and alternators
• Gas reciprocating engines.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
3.39 MW