Storage (Duration 2h)

2 unique locations (5 components)

Land at Slack Lane, Westhoughton, Bolton BL5 3LG (3 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
2.36 MW
Neston Power Generation Plant, Longacres Road, Clayhill Light Industrial Park, Neston, CH64 3RL (2 components)
• 49.5MW Battery Energy Storage facility connected to 132kv network
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2024-25 (T-4), 2024-25 (T-1)
2.36 MW