Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

15 unique locations (84 components)

Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (4 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

Active • 2027-28 (T-4)
172.37 MW
Ordsall Lane, Ordsall, Salford Quays, Salford, M5 3NB (2 components)

A Battery Energy Storage System

Active • 2025-26 (T-4)
1.99 MW
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (5 components)
• A 48MW battery energy storage system
• A 49.5MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
9.02 MW
Land off, Little Morton Farm, Little Morton, Retford, DN22 8BE (5 components)

Battery energy storage unit

Active • 2025-26 (T-4)
19.60 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (6 components)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
10.43 MW
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4), 2025-26 (T-1) ...
35.45 MW
Land at the Risby Estate or in the vicinity of the Creyke Beck 400kV National Grid substation, Yorkshire, HU16 5SR (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
19.83 MW
Land at Private Road No.5, Colwick Industrial Estate, Nottingham, NG4 2JU (9 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.15 MW
Land At Mitchells Ind Park, Barnsley, S73 8HR (12 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2027-28 (T-4)
9.43 MW
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (6 components)
• A New Build Battery Energy Storage System
• A New Build Gas fuelled power plant at Capenhurst substation
Active • 2025-26 (T-4), 2024-25 (T-4) ...
129.72 MW
Kings Farm, Haddons Lane, North Petherton, Bridgwater, Somerset, TA6 6PG (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
5.35 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (9 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
49.62 MW
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (5 components)
• CMU consisting of multiple reciprocating engines and alternators (2)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2024-25 (T-4), 2023-24 (T-4) ...
9.68 MW
Loading map...
Showing 15 locations