Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

553 unique locations (1600 components) - Page 10 of 23

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
Land on the east side of Meaford Road, Barlaston, Stoke-on-Trent, ST15 0UU (3 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• The CMU comprises lithium ion batteries and is capable of exporting the declared capacity for a duration of 2 hours.
Storage (Duration 2h) PULSE CLEAN ENERGY SPV RUBIN LIMITED New Build Generating CMU Meaford RECTORY ST15
Active • 2027-28 (T-4), 2026-27 (T-4) ...
23.49 MW
LAND ON THE EAST SIDE OF CORONATION SQUARE, ARDWICK, M12 6EL (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2024-25 (T-4)
2.46 MW
LAND ON THE EAST SIDE OF CORONATION SQUARE ARDWICK M12 6EL (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Coronation Power Not Prequalified M12
Active • 2024-25 (T-4)
LAND ON CHAPEL LANE, SALISBURY HOUSE FARM, KEADBY, SCUNTHORPE, DN17 3EY (2 components)
• New Build 99.9 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY KB LIMITED New Build Generating CMU Keadby ESS Keadby ESS DN17
Active • 2027-28 (T-4), 2026-27 (T-4)
30.06 MW
Land off Woburn Road, Kempston, Bedford, MK43 9AB (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Storage (Duration 2h) EL ASSET CO. 2 LIMITED New Build Generating CMU Bedford MK43
Active • 2026-27 (T-4)
2.84 MW
Land off Widow Hill Road, Burnley, BB10 2TB (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Burnley C Not Prequalified BB10
Active • 2028-29 (T-4)
4.08 MW
Land off West Bromwich Street, Oldbury, West Midlands, B69 3AZ (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Rowley Regis Not Prequalified B69
Active • 2027-28 (T-4)
11.08 MW
Land off Walton Road, Drakelow, Derbyshire, DE15 9TX (1 component)

New-build energy storage site

Storage (Duration 2h) HARMONY DL LIMITED New Build Generating CMU Drakelow BESS Rejected DE15
Active • 2028-29 (T-4)
31.41 MW
Land off Suttieside Road, Station Place Industrial Estate, North Whitehills, Forfar, Angus, Scotland, DD8 3NH (1 component)

2 hour Battery Energy Storage System

Storage (Duration 2h) SUTTIESIDE BATTERY LIMITED New Build Generating CMU Relay Suttieside Battery Not Prequalified DD8
Active • 2027-28 (T-4)
3.39 MW
Land off Stoke Lane, Norwich, NR14 8QD (3 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 50MW for a 1 hour duration installed on designated land within a compound at Wood Farm
Storage (Duration 1h) Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Norwich A Norwich B +1 more Not Prequalified NR14
Active • 2027-28 (T-4), 2025-26 (T-4)
30.73 MW
Land off Sir William Smith Road, Kirkton Industrial Estate, D11 3RD (1 component) Geocoding Needed

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU ARBROATH092 Rejected D11
Active • 2028-29 (T-4)
10.47 MW
Land Off Severn Road Hallen Bristol South Gloucestershire BS10 7SE (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU AVONMOUTH094 Rejected BS10
Active • 2028-29 (T-4)
14.66 MW
Land off School Lane, Sittingbourne, Kent, ME9 8BY (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Sittingbourne B Not Prequalified ME9
Active • 2028-29 (T-4)
5.68 MW
Land off Saundercroft Road, Broadclyst, Devon, EX5 2PF (1 component)

Battery Storage Plant

Storage (Duration 2h) EXETER STORAGE LIMITED New Build Generating CMU Exeter Storage Limited EX5
Active • 2027-28 (T-4)
44.63 MW
Land off Petre Street, Grimesthorpe, Sheffield, Yorkshire and the Humber, S4 8LU (24 components)

Battery energy storage unit

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Petre Street Petre Street +1 more S4
Active • 2028-29 (T-4), 2027-28 (T-4) ...
29.95 MW
Land off Mansfield Road, Little Morton Farm, Little Morton, Retford, DN22 8HE (18 components)

Battery energy storage unit

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Mansfield Road Mansfield Road +1 more DN22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.97 MW
Land off, Little Morton Farm, Little Morton, Retford, DN22 8BE (5 components)

Battery energy storage unit

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU 50MW Battery 2 Not Prequalified DN22
Active • 2025-26 (T-4)
19.60 MW
Land off Kingston Road, Slimbridge, Stroud, Gloucestershire, England, GL2 7BN (1 component)

2 hour Battery Energy Storage System

Storage (Duration 2h) SLIMBRIDGE ENERGY LIMITED New Build Generating CMU Relay Slimbridge Not Prequalified GL2
Active • 2027-28 (T-4)
5.54 MW
Land off Hogshaw Road, Granborough, Buckingham, MK18 3NL (2 components)

Battery Storage Plant

Storage (Duration 2h) Storage (Duration 5h) EAST CLAYDON STORAGE LIMITED New Build Generating CMU East Claydon Storage Limited East Claydon Storage Limited Not Prequalified MK18
Active • 2028-29 (T-4), 2027-28 (T-4)
181.63 MW
Land Off Grey Friars Way, Stafford, ST16 2PE (16 components)

Battery energy storage unit

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Greyfriars Way Greyfriars Way Not Prequalified ST16
Active • 2028-29 (T-4), 2027-28 (T-4)
18.14 MW
Land off Fordhouse Lane, Stirchley, Birmingham B30 3AG (3 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Active • 2027-28 (T-4), 2026-27 (T-4)
7.80 MW
Land off Fordhouse Lane, Stirchley, Birmingham B30 3AG (3 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Stirchley B1 Stirchley B2 +1 more B30
Active • 2027-28 (T-4), 2026-27 (T-4)
7.80 MW
Land Off Darnall Road, Sheffield, South Yorkshire, S9 5AB (21 components)

Battery energy storage unit

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Darnall Road Darnall Road +1 more S9
Active • 2028-29 (T-4), 2027-28 (T-4) ...
23.97 MW
Land off, Dale Road, Spondon, Derby, East Midlands, England, DE21 7DL (5 components)

Battery energy storage unit

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU 50MW Battery 1 Not Prequalified DE21
Active • 2025-26 (T-4)
19.60 MW
Land off Bilport Lane, Wednesbury, WS10 0PD (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Wednesbury B2 Not Prequalified WS10
Active • 2026-27 (T-4)
5.91 MW
Loading map...
Showing 25 locations