Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

Storage (Duration 2h)

506 unique locations (1605 components) - Page 10 of 21

Land Off Darnall Road, Sheffield, South Yorkshire, S9 5AB (21 components)

Battery energy storage unit (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
23.97 MW
Land off, Dale Road, Spondon, Derby, East Midlands, England, DE21 7DL (5 components)

Battery energy storage unit

Active • 2025-26 (T-4)
Land off Bilport Lane, Wednesbury, WS10 0PD (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Active • 2026-27 (T-4)
5.91 MW
Land off Bilport Lane, Wednesbury, Ws10 0PD (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Active • 2026-27 (T-4)
17.72 MW
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (4 components)
• Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Active • 2028-29 (T-4), 2027-28 (T-4) ...
67.74 MW
Land off Balbeggie Avenue, Thornton, Fife, Scotland, KY1 3NS, United Kingdom (1 component)

2 hour battery energy storage system

Active • 2027-28 (T-4)
7.68 MW
Land off A130, Rettendon, Chelmsford, Essex, East of England, England, SS11 7RL, United Kingdom (3 components)

A Battery Energy Storage System (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
38.94 MW
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 hour battery storage system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
16.17 MW
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
27.15 MW
Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.89 MW
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (6 components)
• A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity. (2)
• A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.25 MW
Land North Of Stoke Lane Dunston Norfolk, NR14 8QD (1 component)

" Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration"

Active • 2028-29 (T-4)
14.66 MW
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (5 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
2.33 MW
Land north of Indian Queens Substation, Domellick Hill (B3279), St Dennis, St Austell, Cornwall, PL26 8BY (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)

Active • 2026-27 (T-4), 2025-26 (T-1)
19.56 MW
Land North Of Gala Bingo, Winterton Road, Scunthorpe, DN15 0DH. (1 component)

A Battery Energy Storage System.

Active • 2027-28 (T-4)
14.62 MW
47.26 MW
Land North East of Sandyforth Farm, Ashton Road, Wigan WN5 7XZ (1 component)

New Build Battery Storage

Active • 2028-29 (T-4)
14.51 MW
Land North East Of Sandyforth Farm Ashton Road Billinge Wigan WN5 7XZ (1 component)

New Build Battery Storage

Active • 2028-29 (T-4)
12.15 MW
Land Northeast of Moat Lane, Moat Farm, Wickersley, Rotherham, S66 1DZ (1 component)

New-build energy storage asset

Active • 2028-29 (T-4)
15.71 MW
Land northeast of Kingston Road, Slimbridge, Gloucestershire, GL27BW (1 component)

2 hour Battery Energy Storage System

Active • 2028-29 (T-4)
7.54 MW
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
• A new build 30MW battery energy storage system (2)
• A new build 29MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (5 components)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and … (2)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, …
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.28 MW
Land north east of Bustleholm Substation Painswick Close Walsall WS5 4SJ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
Loading map...
Showing 25 locations