Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

561 unique locations (1611 components) - Page 12 of 23

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
Land northeast of Kingston Road, Slimbridge, Gloucestershire, GL27BW (1 component)

2 hour Battery Energy Storage System

Storage (Duration 2h) SLIMBRIDGE ENERGY LIMITED New Build Generating CMU SlimbridgeBESS GL2
Active • 2028-29 (T-4)
7.54 MW
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
• A new build 29MW battery energy storage system
• A new build 30MW battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HARMONY JF LIMITED New Build Generating CMU JAMESFIELD JAMESFIELD +3 more KY14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
55.69 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application), Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (5 components)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.71 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (3 components)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU) (2)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
Storage (Duration 1h) Storage (Duration 2h) FP LUX SCURF DYKE SOLAR LIMITED New Build Generating CMU Scurf Dyke Solar Limited Scurf Dyke Solar Limited YO25
Active • 2025-26 (T-1), 2024-25 (T-1) ...
12.03 MW
Land north east of Bustleholm Substation, Painswick Close, Walsall, WS5 4SJ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
19.45 MW
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Bustleholm WS5
Inactive • 2023-24 (T-1)
16.66 MW
Land Next To Bojea Farm, St Austell, PL25 5RU (2 components)
• A New Build Distribution Connected Battery Energy Storage System.
• The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
Storage (Duration 2h) Storage (Duration 1.5h) BALANCE POWER PROJECTS LIMITED New Build Generating CMU ST AUSTELLS ST AUSTELLS PL25
Active • 2027-28 (T-4), 2026-27 (T-4)
17.52 MW
Land Near To Monks House, Westerleigh, BS37 8RD (2 components)

BESS with Lit-Ion technology, 2 hours duration

Storage (Duration 2h) RENBAT 6 LIMITED New Build Generating CMU Westerleigh1 Westerleigh2 Not Prequalified BS37
Active • 2027-28 (T-4)
30.60 MW
Land Near School Lane, Sittingbourne, ME9 8QG (1 component)

Battery Storage

Storage (Duration 2h) JBM SOLAR PROJECTS 27 LIMITED New Build Generating CMU CMU_RASP Not Prequalified ME9
Active • 2027-28 (T-4)
4.61 MW
Land near School Lane, Sittingbourne, ME9 8QG (1 component)

Battery Storage

Active • 2028-29 (T-4)
8.14 MW
Land Near Minety Substation, Minety, Wiltshire, SN16 9DX (1 component)

Battery Storage

Storage (Duration 2h) JBM SOLAR PROJECTS 14 LTD New Build Generating CMU CMU_MINE SN16
Active • 2027-28 (T-4)
4.39 MW
Land near Ellbridge Lane, Hatt, Saltash, PL12 6PU (2 components)
• New Build CMU comprising of Solar PV and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Solar Photovoltaic Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Landulph Battery Landulph Solar Not Prequalified PL12
Active • 2026-27 (T-4)
10.58 MW
Land near Ellbridge Lane, Ellbridge, Landulph, Saltash, Cornwall, PL12 6PU (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Landulph Battery PL12
Active • 2027-28 (T-4)
5.34 MW
LAND LYING TO THE WEST OF STEPHENSON ROAD, WILSDEN, BRADFORD, BD15 0BZ (1 component)

New Build Battery Storage

Storage (Duration 2h) 24 POWER LTD New Build Generating CMU BRADWESTBESS BD15
Active • 2028-29 (T-4)
20.94 MW
Land lying to the south west of Rouncil Lane, Kenilworth (CV8 1NN) (1 component)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Storage (Duration 2h) FLEXION ENERGY HOLDINGS UK LTD New Build Generating CMU Not Prequalified CV8
Active • 2027-28 (T-4)
5.85 MW
Land Lying To The South Of Manor Farm, Ratcliffe On Soar, Nottingham NG11 0EA (1 component)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Ratcliffe0082 Not Prequalified NG11
Active • 2027-28 (T-4)
18.47 MW
Land lying to the east of Rectory Lane, Upton Warren, Bromsgrove, B61 7ET (1 component)

This is a 29.700 MW battery storage facility connected at 66kV.

Storage (Duration 2h) RECTORY FARM ENERGY STORAGE LTD New Build Generating CMU Rectory Farm Not Prequalified B61
Active • 2028-29 (T-4)
4.67 MW
Land lying at Southfields Farm, Garsdon, Malmesbury, SN16 9PQ (3 components)

A Battery Energy Storage System.

Storage (Duration 2h) Storage (Duration 8h) PD688IRO LTD PD503HAN LTD New Build Generating CMU Minety 2 Southfields 1 +1 more SN16
Active • 2028-29 (T-4), 2025-26 (T-4)
98.17 MW
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD. (3 components)

Lithium-based battery energy storage system

Active • 2026-27 (T-4), 2025-26 (T-1) ...
26.97 MW
LAND EAST OF LEDSTON SUBSTATION, LEDSTON, WEST YORKSHIRE, WF10 2AW (2 components)

New Build 25 MW Battery Energy Storage system

Storage (Duration 2h) Storage (Duration 1.5h) HARMONY LS LIMITED New Build Generating CMU Leadstone ESS Leadstone ESS Not Prequalified WF10
Active • 2027-28 (T-4), 2026-27 (T-4)
7.52 MW
3.23 MW
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (3 components)
• New Build 49.99 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CAS LIMITED New Build Generating CMU Castleford ESS Castleford ESS +1 more Rejected WF11
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.79 MW
Land east of Grahamston Road, Paisley, PA2 7DA (1 component)

60MW / 120MWh BESS

Storage (Duration 2h) BLUESTONE ENERGY LTD New Build Generating CMU DYKEBAR Not Prequalified PA2
Active • 2026-27 (T-4)
14.18 MW
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) Storage (Duration 4h) DAMSONGREEN ENERGYFARM LIMITED New Build Generating CMU Pivot Power Bramford Pivot Power Bramford +1 more IP8
Active • 2026-27 (T-4), 2025-26 (T-1) ...
35.45 MW
Loading map...
Showing 25 locations