Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

360 unique locations (1546 components) - Page 13 of 15

Ryton Industrial Estate Blaydon NE21 4NT (2 components)

2 hour containerised battery storage

Active • 2028-29 (T-4)
10.47 MW
Salisbury BESS, The Avenue, Salisbury, Wiltshire, South West England, England, SP2 0BU, United Kingdom (1 component)

The CMU is a Battery Energy Storage System with a planned 49.5MW active power output, consisting of containerised batteries.

Inactive •
Scawby Brook, Brigg, Lincolnshire, DN20 9LT. (4 components)

Brigg Battery 2 hour duration

Active • 2024-25 (T-1), 2025-26 (T-4) ...
50.74 MW
Selby, North Yorkshire, YO8 6PG (4 components)
• A 40MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
33.45 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (8 components)
• 50MW of BESS to be installed within a future Greener Grid Park.
• BESS project to be installed within a future Greener Grid Park.
Inactive •
Site at Whitehill Farm, Coatbridge Road, Gartosh, G69 8DT, United Kingdom (1 component)

New build battery storage

Active • 2028-29 (T-4)
41.88 MW
Slack Lane, Bolton, Greater Manchester, BL5 3LJ (4 components)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4), 2028-29 (T-4)
8.84 MW
Slack Lane, Westhoughton, BL5 3LB (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Inactive •
Smithyard Lane, Williton, TA4 4NN (5 components)

New Build CMU comprising of battery storage and associated plant

Inactive •
South Fambridge Hall Solar Farm Fambridge Road, South Fambridge, Rochford, SS4 3LS (1 component)

20MW/40MWh of Lithium Iron Battery Electric Storage System, comprising 6 storage containers, and associated metering, switchgear and electrical infrastructure. the Battery will be its own BMU and will be co-located …

Inactive •
Southmoor Lane, Havant, Hampshire, PO9 1JW (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Inactive •
South of Carnegie Road, Liverpool, L13 3AT (1 component)

New build battery storage

Inactive •
Speke Hall Avenue, Speke, Liverpool, L24 8DA (1 component)

A new build, battery energy storage system

Active • 2028-29 (T-4)
3.19 MW
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JP (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.

Inactive •
St Owens Cross, Peterstow, Hereford, HR9 6AU (2 components)

A lithium-ion Energy Storage Plant

Active • 2028-29 (T-4)
14.36 MW
St Philips energy storage facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4)
3.48 MW
Loading map...
Showing 25 locations