Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

561 unique locations (1611 components) - Page 13 of 23

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
Land East of Bowbridge Lane, New Balderton, Newark, Nottinghamshire, NG24 3BY (2 components) Geocoding Needed

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Newark B Newark B Not Prequalified NG24
Active • 2028-29 (T-4), 2027-28 (T-4)
6.71 MW
Land east of A981, Fraserburgh, Aberdeenshire (2 components) Geocoding Needed

12 x 3.800MW / 7.491MWh storage units installed on land adjacent to A981, Fraserburgh

Storage (Duration 2h) FRASERBURGH ENERGY LTD New Build Generating CMU Not Prequalified
Active • 2026-27 (T-4), 2023-24 (T-1)
13.31 MW
LAND EAST AND WEST OF HONILEY ROAD (A4177), HONILEY, KENILWORTH, WARWICKSHIRE (1 component) Geocoding Needed

A 49.400 MW / 98.800 MWh battery energy storage system

Storage (Duration 2h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU BERKSWELL Rejected
Active • 2026-27 (T-4)
11.67 MW
Land east and west of 2 Riversdale Way, Lemington, Newcastle, NE15 8AB (1 component) Geocoding Needed

CMU ID 22STE4, a new build battery storage CMU

Storage (Duration 2h) PEGANA GREEN ENERGY LIMITED New Build Generating CMU Stella North Not Prequalified NE15
Active • 2026-27 (T-4)
12.65 MW
Land directly South to Coventry Substation, Parrotts Grove, Coventry, CV2 1NQ (1 component) Geocoding Needed

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
19.45 MW
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (1 component) Geocoding Needed

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Coventry CV2
Inactive • 2023-24 (T-1)
16.66 MW
Land close to Smeaton Shaw Farm, Dalkeith, EH22 2NL (2 components) Geocoding Needed

2H duration Lithium Ion Battery Storage New Build CMU.

Active • 2028-29 (T-4), 2027-28 (T-4)
70.27 MW
23.10 MW
Land at Whitegate Substation, Broadgate, Oldham, OL9 9XA (3 components) Geocoding Needed
• A Battery Energy Storage System.
• A New Build Gas fuelled power plant.
Reciprocating engines Storage (Duration 2h) HD144WHI LTD New Build Generating CMU Whitegate Whitegate +1 more OL9
Active • 2025-26 (T-4), 2024-25 (T-4) ...
83.08 MW
Land At Westerton Road, Keith, Moray, AB55 5NR (1 component) Geocoding Needed

CMU 24KEI4 is a battery storage CMU.

Storage (Duration 2h) FIELD KEITH LTD New Build Generating CMU Field Keith AB55
Active • 2028-29 (T-4)
7.23 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components) Geocoding Needed
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a gas power facility on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
817.08 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL (4 components) Geocoding Needed

Battery Storage Plant

Storage (Duration 2h) THURROCK STORAGE LIMITED New Build Generating CMU Thurrock Storage Limited Thurrock Storage Limited +2 more RM18
Active • 2027-28 (T-4), 2025-26 (T-1)
63.81 MW
Land at Vause Farm, Town Lane, Charnock Richard, Chorley, PR7 5HL (1 component) Geocoding Needed

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) SIRIUS ECODEV (VAUSE) LTD New Build Generating CMU Vause Farm Not Prequalified PR7
Active • 2025-26 (T-4)
7.95 MW
Land at Tuxton Farm, Plympton, Plymouth, PL7 5AA (1 component) Geocoding Needed

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Plympton Not Prequalified PL7
Active • 2026-27 (T-4)
7.08 MW
Land at the Risby Estate or in the vicinity of the Creyke Beck 400kV National Grid substation, Yorkshire, HU16 5SR (1 component) Geocoding Needed

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
19.83 MW
Land at the Risby Estate or in the vicinity of the Creyke Beck 400kV National Grid substation, Yorkshire, HU16 5SR (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CB BATTERY LIMITED New Build Generating CMU Creyke Beck 1 HU16
Active • 2025-26 (T-4)
Land at The Magazine, Hull Road, Selby, YO8 5BJ (24 components) Geocoding Needed
• Battery energy storage unit
• Battery storage unit
Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Hull Road Hull Road YO8
Active • 2028-29 (T-4), 2027-28 (T-4)
29.76 MW
Land at Sturts Farm, Three Cross Road, West Moors, Ferndown, BH21 6QU (1 component) Geocoding Needed

98MW / 196MWh BESS

Storage (Duration 2h) BLUESTONE ENERGY LTD New Build Generating CMU STURTS FARM Not Prequalified BH21
Active • 2026-27 (T-4)
23.16 MW
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JP (1 component) Geocoding Needed

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Storage (Duration 2h) R&S ENERGY LIMITED New Build Generating CMU Buxton BESS SK17
Active • 2026-27 (T-4)
2.48 MW
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 component) Geocoding Needed

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Storage (Duration 2h) R&S ENERGY LIMITED New Build Generating CMU Buxton BESS SK17
Active • 2024-25 (T-1)
3.46 MW
Land at STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 component) Geocoding Needed

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16MW, located in Buxton.

Storage (Duration 2h) R&S ENERGY LIMITED Existing Generating CMU Buxton BESS SK17
Active • 2025-26 (T-1)
3.73 MW
Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (2 components) Geocoding Needed

Lithium ion battery storage system capable of charging, storing and discharging electricity.

Active • 2028-29 (T-4), 2025-26 (T-1)
2.61 MW
Land at Sterte Avenue West, Poole, BH15 2AL (12 components) Geocoding Needed
• A 7.5MW Tesla Battery Energy Storage System
• A 7MW Battery Energy Storage System
• Tesla Battery Energy Storage System
Storage Storage (Duration 1h) Storage (Duration 2h) HARMONY HB LIMITED Existing Generating CMU HOLES BAY HOLESBAY +4 more BH15
Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.69 MW
Land at Somerford Farm, SN16 9RN (4 components) Geocoding Needed
• A Battery Energy Storage System
• A Battery Energy Storage System.
Storage (Duration 2h) Storage (Duration 8h) PD813ETY LTD PD688IRO LTD New Build Generating CMU Minety 3 Minety 3 +2 more SN16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
77.05 MW
Loading map...
Showing 25 locations