Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

358 unique locations (1544 components) - Page 14 of 15

Surteco UK Ltd, Widow Hill Road, Burnley, BB10 2TB (1 component)

New Build CMU comprising of battery storage and associated plant

Inactive •
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (5 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Inactive •
Tees Dock Road Redcar and Cleveland Tees Valley England TS6 7AB (1 component)

A new build 100MW/200MWh battery storage facility connected to the Transmission network, located in Teesworks, Redcar

Inactive •
Templeton Farm, Birkhill, Dundee, Scotland. DD3 0QH (1 component)

A 2-hour duration containerized battery

Inactive •
The fields close to The Cottage, The Priory, Priory Lane, Little Wymondley, Hitchin, SG4 7HD (1 component)

WYBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

Active • 2028-29 (T-4)
6.28 MW
The fields close to the Land at Little Hale Drove, Sleaford, NG34 9BG, United Kingdom (3 components)

LHBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

Active • 2028-29 (T-4)
12.56 MW
The land South-West of the Dunoon Electrical Substation located on Ardnadam Farm, Sandbank, Dunoon, Argyll and Bute, PA23 8PN (1 component)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Inactive •
Tillingdown Lane, Caterham, CR3 7JA (4 components)
• A 12MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
15.04 MW
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (2 components)

Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm.

Active • 2025-26 (T-1), 2028-29 (T-4)
10.79 MW
Titchfield Lane, Wickham, Fareham PO15 6DY (1 component)

CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System)

Inactive •
Todrig Farm Coldstream TD12 4JA (7 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and …

Active • 2028-29 (T-4)
71.20 MW
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
• CMU ID 22NEW1, a new build battery storage CMU
• CMU ID 23NEW1, a new build battery storage CMU
• CMU ID 24NEW1, a new build battery storage CMU
Active • 2023-24 (T-1), 2024-25 (T-1) ...
23.96 MW
Uskmouth Power Station West Nash Road, Nash, Newport, Wales, NP18 2BZ (2 components)

AW1 Energy Storage Limited (AW1) will develop a Battery Energy Storage System (BESS) at land adjacent to the substation and will initially develop a 120 MW / 240 MWh BESS …

Active • 2028-29 (T-4)
40.20 MW
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (4 components)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
62.68 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (22 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Inactive •
Welkin Road, Bredbury, SK6 2BH (4 components)
Inactive •
Wellington Street, Oldham, Lancashire OL4 1SA (6 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Inactive •
Westfield Road, Carlton, Wakefield, WF3 3RJ (2 components)

Battery energy storage system

Active • 2028-29 (T-4)
20.90 MW
West House Farm, Scruton, Northallerton, DL7 0RQ (3 components)

18MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured …

Active • 2028-29 (T-4)
7.54 MW
Loading map...
Showing 25 locations