Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

358 unique locations (1544 components) - Page 14 of 15

Castlelaurie Industrial Estate, Bankside, Falkirk FK2 7XF (3 components)

New build battery storage

Active • 2028-29 (T-4)
15.33 MW
Calow Green, Calow, North East Derbyshire, S44 5XQ (4 components)

A stand alone Battery Energy Storage System.

Active • 2027-28 (T-4), 2028-29 (T-4)
26.23 MW
Burton Green Farm, Hobs Lane, Kenilworth, Warwickshire, CV8 1QB (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4)
47.89 MW
Burton Enterprise Park Hawkins Lane Burton upon Trent Staffordshire DE14 1QG (3 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
10.47 MW
Bumpers 2 BESS, Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 component)

A new build battery energy storage system

Inactive •
Bronze Cricket Club, Chapel Lane, Great Barr, Walsall, WS9 0QU (1 component)

2 hr duration Battery Energy Storage System located in England

Active • 2028-29 (T-4)
8.80 MW
Bristol Avenue, Blackpool, FY2 0JF (6 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Inactive •
Braehead Farm Riccarton Kilmarnock KA1 5LN (8 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land, approximately 250 Metres north of Kilmarnock Substation. …

Active • 2028-29 (T-4)
71.20 MW
Blandford Road, Poole, BH16 6AB (7 components)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Inactive •
Barton Hill Way, Torquay, TQ2 8JG (10 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
• New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
Inactive •
B970, Boat of Garten, Highland, Scotland, PH24 3BY, United Kingdom (1 component)

New build 49.9MW / 99.8MWh battery energy storage system

Inactive •
Auchteraw Farm, Fort Augustus, PH32 4BT (6 components)
• New build battery storage CMU with CMU ID 22AUC1
• New build battery storage CMU with CMU ID 23AUC1
• New build battery storage CMU with CMU ID 24AUC1
Active • 2023-24 (T-1), 2024-25 (T-1) ...
73.66 MW
Ashlett Creek, Fawley, Hampshire, SO45 1DT (1 component)

New Build CMU comprising of battery storage and associated plant

Inactive •
Arran View Jameston Farm Dalry North Ayrshire KA24 4EY (1 component)

13 x 3.800MW / 7.491MWh storage units installed on designated land within a brownfield site at Jameston Farm, Dalry, North Ayrshire, KA24 4EY

Inactive •
Ardencaple Farm, Rhu, Helensburgh, Argyll & Bute, G84 8JX (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
10.47 MW
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (16 components)
• Battery storage plant
• Existing generating battery storage unit.
Inactive •
Loading map...
Showing 25 locations