Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

Search Guide

This registry provides comprehensive search capabilities across all Capacity Market components:

  • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
  • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
  • CMU ID Search: Enter a specific CMU ID to find exact components
  • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

The search is intelligent and will try to determine what you're looking for based on your query.

You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

Understanding Auctions

The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

  • T-4 auctions: Held 4 years ahead of the delivery year
  • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

Search Results

Search results are grouped by location and show important details about each component:

  • Active Components with auction years 2024-25 or later
  • In-Active Components with only auction years before 2024-25
  • Company Name Click to view all components for this company
  • Technology Click to search for this technology type
  • CMU: XXX Click to search for this CMU ID
  • Auction Year Click to view details for this specific auction

Each result shows the component's capacity, location details, and participation in specific auction years.

You can sort results by relevance, location, or date using the sort options.

Pagination controls appear at the bottom when there are multiple pages of results.

Component Grouping

Components at the same location with the same description are grouped together to reduce duplication.

Each group shows:

  • All CMU IDs for components at that location
  • All auction years, sorted with newest first
  • An Active/Inactive status based on auction years

Grouping helps identify multi-year contracts and related components at the same site.

The total capacity shown combines all components in the group.

Components can be expanded to show individual details by clicking the expand icon.

Sorting and Filtering

You can sort search results by:

  • Relevance: Most relevant matches first
  • Location: Alphabetical order by location name
  • Date: By auction year (newest or oldest first)
  • Capacity: Highest or lowest capacity first

Click the column headers to change sort order.

You can filter results using the search refinements at the top of the results page:

  • Filter by technology type (e.g., only show batteries)
  • Filter by active status (show only active or inactive components)
  • Filter by auction year (show only components from specific auctions)

Map Explorer & Map View

We provide two map-based tools for exploring capacity market data:

Map Explorer

The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

  • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
  • Advanced Filtering: Filter by technology type, company, delivery year, and active status
  • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
  • Full-Screen Map: Maximizes map space for detailed geographical analysis
Search Map View

The Search Map View combines search functionality with map visualization, offering:

  • Search-First Approach: Start with text searches, then visualize results on the map
  • Integrated Results: Search results and map display work together
  • Performance Optimized: Streamlined for fast search result mapping

Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

Map Features:
  • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
    GasDSRNuclearCHPSolarWind
    BatteryBiomassHydroInterconnectorCoalOther
  • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
  • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
  • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
  • Interactive Markers: Click on individual markers to see detailed information about components at that location

Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

Contact Us

We're here to help with any questions about the Capacity Market Registry.

Email

For general inquiries and support:

For LLMs

Complete programmatic access guide for LLMs:

Loading...
Loading...
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • Trading Board
  • Buy Me A Coffee
  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Storage (Duration 2h)

    506 unique locations (1605 components) - Page 15 of 21

    All
  • Active
  • Inactive
  • Sort by: A-Z Components MW Date
    Land and buildings lying to the East and West of Swinderby Road, Eagle and Swinethorpe being part of the Eagle Hall Estates, LN6 9JA(1 component)

    A 2 hour BESS connected directly to the DNO network

    BatteryStorage (Duration 2h)GRIDSOURCE LIMITEDLN6
    Active • 2025-26 (T-1)
    0.26 MW
    Land adjoining Outclough Farm, Chatterley, Whitfield, Biddulph Road, Stoke on Trent, ST6 8UW(1 component)

    The construction of a new build Battery Energy Storage System (BESS) will comprise of a number of new Batteries supplied by Trina Storage Elementa 2.0 solution and associated equipment required …

    Storage (Duration 2h)CHATTERLEY ENERGY STORAGE LIMITEDST6
    Active • 2028-29 (T-4)
    10.45 MW
    LAND ADJOINING BATES ROAD QUAYSIDE INDUSTRIAL ESTATE MALDON CM9 5FA(1 component)

    CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

    BatteryStorage (Duration 2h)URBAN RESERVE STORAGE LIMITEDCM9
    Active • 2024-25 (T-4)
    Land Adjacent Unit 66 Gravelly Industrial Park Walker Dr, Birmingham B24 9AW(1 component)

    The CMU is a new build 50MW/100MWh battery storage facility connected to the Western Power distribution network at 33kV, located at the Gravelly Industrial Park, Birmingham.

    BatteryStorage (Duration 2h)GRAVELLY ENERGY STORAGE LTDB24
    Active • 2026-27 (T-4)
    11.58 MW
    Land adjacent to Worset Lane, Hart. TS27 3BL(1 component)

    Battery Energy Storage System connecting into the Hartmoor GSP, to connect into the Transmission system via new bay.

    BatteryStorage (Duration 2h)FIELD HARTMOOR LTDTS27
    Active • 2028-29 (T-4)
    35.47 MW
    LAND ADJACENT TO WORMALD GREEN SUB-STATION, STATION LANE, WORMALD GREEN, HARROGATE, HG3 3RX(3 components)
    • Energy Storage Site
    • New Build 33 MW Battery Energy Storage system
    • New Build Battery Energy Storage system
    BatteryStorage (Duration 2h)Storage (Duration 1.5h)HEIT WG LIMITEDHG3
    Active • 2026-27 (T-4), 2025-26 (T-1) ...
    14.35 MW
    Land adjacent to Taunton GSP Substation, Taunton, Somerset, TA4 1AG(2 components)

    New Build CMU comprising of battery storage and associated plant (2)

    Storage (Duration 2h)CONRAD ENERGY (DEVELOPMENTS) II LIMITEDTA4
    Active • 2028-29 (T-4), 2027-28 (T-4)
    13.41 MW
    Land adjacent to Taunton GSP Substation, TA4 1AG(1 component)

    New Build Generating CMU comprising of battery storage and associated plant.

    BatteryStorage (Duration 2h)CONRAD ENERGY (DEVELOPMENTS) II LIMITEDTA4
    Active • 2026-27 (T-4)
    7.09 MW
    Land adjacent to SSE ( South West to) substation on B9134 Old Brechin Road, Forfar. DD8 3DX(1 component)

    "49.9 MW standalone battery energy storage project. The site will comprise of batteries, power conversion systems, transformers, switchgear,monitoring and control systems."

    BatteryStorage (Duration 2h)LUNANHEAD ENERGY STORAGE LIMITEDB9
    Active • 2027-28 (T-4)
    5.39 MW
    Land adjacent to Salisbury Substation, Salisbury, SP2 0BL(1 component)

    49.5MW Battery Energy Storage System

    BatteryStorage (Duration 2h)SSE BATTERY SALISBURY LIMITEDSP2
    Active • 2024-25 (T-4)
    Land adjacent to Norrington Common BSP, Norrington Lane, Broughton Gifford, Melksham, Wiltshire, SN12 8LT(2 components)

    New Build CMU comprising of battery storage and associated plant (2)

    Storage (Duration 2h)CONRAD ENERGY (DEVELOPMENTS) II LIMITEDSN12
    Active • 2028-29 (T-4), 2027-28 (T-4)
    6.71 MW
    Land adjacent to Norrington Common BSP, Norrington Lane, Broughton Gifford, Melksham, SN12 8LT(1 component)

    New Build Generating CMU comprising of battery storage and associated plant.

    BatteryStorage (Duration 2h)CONRAD ENERGY (DEVELOPMENTS) II LIMITEDSN12
    Active • 2026-27 (T-4)
    3.59 MW
    Land Adjacent to No 13 Westerton Road Keith, Moray, Scotland AB55 5FA(2 components)

    50MW of BESS to be installed within existing Rotating Stabiliser site. (2)

    BatteryStorage (Duration 2h)Storage (Duration 4h)KEITH STORAGE SOLUTIONS LIMITEDAB55
    Active • 2026-27 (T-4), 2025-26 (T-4)
    8.48 MW
    Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS(5 components)
    • 49.5MW Battery Energy Storage facility (2)
    • 49.9MW Battery Energy Storage facility
    BatteryStorage (Duration 2h)Storage (Duration 1.5h)HARMONY (PW) 2 LIMITEDHU16
    Active • 2025-26 (T-4), 2024-25 (T-4) ...
    18.33 MW
    Land adjacent to Berryburn Substation Moray(1 component)

    Corshellach Energy Storage Limited is planning to install a 2-hr battery storage system.

    BatteryStorage (Duration 2h)CORSHELLACH ENERGY STORAGE LIMITED
    Active • 2028-29 (T-4)
    7.41 MW
    Land Adjacent to Belfield Substation, Belfield Road, Rochdale, Manchester, OL16 2XX(1 component)

    New Build Generating CMU comprising of battery storage and associated plant.

    BatteryStorage (Duration 2h)CONRAD ENERGY (DEVELOPMENTS) II LIMITEDOL16
    Active • 2026-27 (T-4)
    3.97 MW
    Land Adjacent to Belfield Substation, Belfield Road, Rochdale, Manchester, Greater Manchester, OL16 2XX(2 components)

    New Build CMU comprising of battery storage and associated plant (2)

    Storage (Duration 2h)CONRAD ENERGY (DEVELOPMENTS) II LIMITEDOL16
    Active • 2028-29 (T-4), 2027-28 (T-4)
    7.62 MW
    Land adjacent Mount Pleasant Farm, Green Lane, Barton, Preston, PR3 0RP(1 component)

    Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

    BatteryStorage (Duration 2h)FPC ELECTRIC LAND LIMITEDPR3
    Active • 2027-28 (T-4)
    6.93 MW
    Land 90 Metres South West Of Noahs Ark Old Gallows Road Perth PH1 1QE(2 components)
    • 2 hours Lithium-In battery storage facility in Scotland connected to the distribution network with a connection capacity of 49.4MW
    • 49.9 MW standalone battery energy storage project.
    BatteryStorage (Duration 2h)GLENDEVON ENERGY STORAGE LIMITEDPH1
    Active • 2027-28 (T-4), 2025-26 (T-1)
    18.80 MW
    Land 800m North of Suttieside Road, Forfar, Scotland, DD83NL(1 component)

    2 hour Battery Energy Storage System

    Storage (Duration 2h)SUTTIESIDE BATTERY LIMITEDDD8
    Active • 2028-29 (T-4)
    4.36 MW
    Land 300M NE Of Bridge Of Dun Substation Dun Montrose(1 component)

    2 hour containerised battery storage

    Storage (Duration 2h)DUNMILL ENERGY STORAGE LIMITED
    Active • 2028-29 (T-4)
    7.41 MW
    Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP(2 components)

    This is a 99.9MW battery storage facility connected at 132kV. (2)

    BatteryStorage (Duration 2h)Storage (Duration 1.5h)Plutus Energy LTDY08
    Active • 2026-27 (T-4), 2025-26 (T-1)
    43.38 MW
    Kintore, Inverurie, Aberdeenshire, AB51 0XY(2 components)

    New Build CMU comprising of battery storage and associated plant (2)

    BatteryStorage (Duration 2h)CONRAD ENERGY (DEVELOPMENTS) II LIMITEDAB51
    Active • 2028-29 (T-4), 2027-28 (T-4)
    13.39 MW
    Kings Farm, Haddons Lane, North Petherton, Bridgwater, Somerset, TA6 6PG(1 component)

    New Build CMU comprising of battery storage and associated plant

    BatteryStorage (Duration 2h)CONRAD ENERGY (DEVELOPMENTS) II LIMITEDTA6
    Active • 2027-28 (T-4)
    5.35 MW
    KIMPTON WOOD SOLAR FARM, SHODDESDEN GRANGE, GREAT SHODDESDEN, ANDOVER SP11 9LP(2 components)

    This CMU component represents the BESS system of a co-located (solar and storage) site (2)

    BatteryStorage (Duration 2h)LOW CARBON UK SOLAR OPERATIONS LIMITEDSP11
    Active • 2027-28 (T-4), 2025-26 (T-1)
    3.32 MW
    Loading map...
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access