Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

521 unique locations (1480 components) - Page 17 of 21

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
HAWK'S NEST FARM, MISLINGFORD, FAREHAM, PO17 5AR (1 component)

A standalone 2 hour BESS connecting directly to the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 2 Rejected PO17
Active • 2025-26 (T-1)
0.26 MW
Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (2 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Dellsome Power AL4
Active • 2026-27 (T-4), 2025-26 (T-4)
1.20 MW
Harrop Lane, Hare Croft, Wilsden, Bradford, West Yorkshire,BD15 0BZ (3 components)

New build battery storage. (3)

Storage (Duration 2h) UK BATTERY STORAGE LTD New Build Generating CMU Bradford Bradford +1 more BD15
Active • 2025-26 (T-4), 2024-25 (T-1) ...
45.36 MW
Hams Lane, Lea Marston CP, North Warwickshire, Warwickshire, England, B76 0BL (1 component)

98MW / 196MWh BESS

Storage (Duration 2h) BLUESTONE ENERGY LTD New Build Generating CMU LEA MARSTON Not Prequalified B76
Active • 2026-27 (T-4)
23.16 MW
Hamble Lane, Old Netley, Southampton, SO31 5FT (2 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Hamble Hamble2 Not Prequalified SO31
Active • 2025-26 (T-4)
Haigh Park Road, Stourton, Rothwell, Leeds, West Yorkshire. LS10 1RT (2 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) WESSEX ENERGY STORAGE LTD New Build Generating CMU WES001 WES001 Not Prequalified LS10
Active • 2025-26 (T-4)
Haddon Farm, Haddons Lane, Claveshay, North Petherton, Bridgwater, TA6 6PG (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
7.09 MW
Grendon Lakes, Main Road, Grendon, Northampton, Northamptonshire NN7 1JW. (4 components)

Battery Storage Plant (3)

Storage (Duration 1h) Storage (Duration 2h) GRENDON LAKES STORAGE LIMITED New Build Generating CMU Grendon Lakes Storage Limited Grendon Lakes Storage Limited +2 more Not Prequalified NN7
Active • 2028-29 (T-4), 2027-28 (T-4) ...
20.22 MW
Green Lane, Thurcroft, Wickersley, Rotherham, UK, S66 9JD (1 component)

A New build generating storage CMU

Storage (Duration 2h) HC ESS7 LIMITED New Build Generating CMU Not Prequalified S66
Active • 2028-29 (T-4)
10.47 MW
Greenfield site, Stainton, Rotherham, S66 7RQ (1 component)

Battery Storage 2 hour duration

Storage (Duration 2h) CBS ENERGY STORAGE ASSETS UK LIMITED New Build Generating CMU Not Prequalified S66
Active • 2026-27 (T-4)
18.90 MW
Greenfields Farm Worcester Road Upton Warren Bromsgrove B61 7JD (12 components)

Battery energy storage unit (2)

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Greenfields Farm Greenfields Farm B61
Active • 2028-29 (T-4), 2027-28 (T-4)
12.70 MW
Great Elm Farm, Pond Lane, Charlton, Wiltshire, SN16 9DS (2 components)

A Battery Energy Storage System (2)

Storage (Duration 2h) HD381GRE LTD New Build Generating CMU Minety 4 Minety 4 Not Prequalified SN16
Active • 2026-27 (T-4), 2025-26 (T-4)
11.22 MW
Goyt Hall Farm, Dark Lane, Romiley, Stockport SK6 3LH (2 components)
• A Battery Energy Storage System
• A distribution connected Battery Energy Storage System
Storage (Duration 2h) GOYT HALL PROJECT COMPANY LTD ETP-QQR ENERGY LIMITED New Build Generating CMU Goyt Farm Goyt Hall SK6
Active • 2028-29 (T-4), 2025-26 (T-4)
8.38 MW
Gladstone St, Blackburn, BB1 3ES (3 components)
• New Build CMU comprising of battery storage and associated plant (2)
• New Build Generating CMU comprising of battery storage and associated plant.
Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Blackburn B Blackburn B +1 more BB1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.24 MW
Gerard Hall Battery Site, Mill Lane, Nursling SO16 0YE (2 components)

New Battery Storage Site comprising brand new batteries & inverters

Active • 2025-26 (T-4)
GCC Summerston, Balmore Road, Glasgow, G23 5HD (1 component)

60MW / 120MWh BESS

Storage (Duration 2h) BLUESTONE ENERGY LTD New Build Generating CMU SUMMERSTON Not Prequalified G23
Active • 2026-27 (T-4)
14.18 MW
GCC Cathkin, Cairnmuir Road, Glasgow, G74 4GY (1 component)

60MW / 120MWh

Storage (Duration 2h) BLUESTONE ENERGY LTD New Build Generating CMU CATHKIN Not Prequalified G74
Active • 2026-27 (T-4)
14.18 MW
Former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (1 component)

CMU to comprise multiple individual storage units metered and despatched centrally

Active • 2025-26 (T-4)
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (6 components)

CMU to comprise multiple individual storage units metered and despatched centrally (3)

Storage (Duration 2h) Sembcorp Utilities (UK) Limited New Build Generating CMU S25BS3 Not Prequalified TS6
Active • 2026-27 (T-4), 2025-26 (T-4) ...
66.67 MW
Former Scrap Yard, Town Lane, Charnock Richard, Chorley, PR7 5HQ (3 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (3)

Storage (Duration 2h) PULSE CLEAN ENERGY SPV ANNING LIMITED New Build Generating CMU TL2023 Town Lane PR7
Active • 2027-28 (T-4), 2025-26 (T-1) ...
18.72 MW
Former Sanmex Site, Land at Dalmarnock Road, Rutherglen, South Lanarkshire, G73 1NY (2 components)
• New Build Battery Storage
• New build battery Storage
Storage (Duration 2h) DALMARNOCK BESS LTD New Build Generating CMU Dalmarnock A Dalmarnock BESS Not Prequalified G73
Active • 2028-29 (T-4)
15.22 MW
Field At Grid Reference 504139 456454, Back Lane, Skerne, East Riding Of Yorkshire, YO25 8NQ (Address in planning application) Land Adjacent Driffield Supply Point, Wansford Road, Driffield (Address of grid connection) (2 components)
• CMU is a 28MW/56MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV system and shares a grid connection. The solar PV and the BESS will be separately metered and registered as separate BMUs. The BESS will connect to the grid via the 20/66 kV substation of the Facility, connecting to additional panels on the 20kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 28 containers with Lithium Ion battery modules (LFP), containers further including HVAC, fire extinguishing system and controls; 7 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/20kV step up transformer and a 630A 20 kV Ring Main Unit (RMU);
• CMU is a 32MW 32MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV system and shares a grid connection. The solar PV and the BESS will be separately metered, and registered as separate BMUs. The BESS will connect to the grid via the 20/66 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 16 containers with Lithium Ion battery modules (LFP), containers further including HVAC, fire extinguishing system and controls; 8 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU);
Storage (Duration 1h) Storage (Duration 2h) DRIFFIELD SOLAR AND STORAGE LIMITED New Build Generating CMU Driffield Solar and Storage Driffield Solar and Storage YO25
Active • 2027-28 (T-4), 2026-27 (T-4)
6.32 MW
Fiddlers Ferry BESS, Widnes Rd, Warrington WA5 2UT (2 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (2)

Storage (Duration 2h) SSE UTILITY SOLUTIONS LIMITED SSE FIDDLERS FERRY BATTERY LIMITED New Build Generating CMU Fiddlers BESS Fiddlers BESS WA5
Active • 2027-28 (T-4), 2026-27 (T-4)
50.45 MW
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (3 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (3)

Storage (Duration 2h) SSE FERRYBRIDGE BATTERY LIMITED SSE UTILITY SOLUTIONS LIMITED New Build Generating CMU Ferrybridge BESS Ferrybridge BESS +1 more WF11
Active • 2027-28 (T-4), 2026-27 (T-4) ...
89.14 MW
Felindre Pumping Station Substation, Pant Lasau Road, Llangyfelach, Morriston, SA5 7PA (1 component)

16MW/32MWh BESS on a future Greener Grid Park.

Storage (Duration 2h) STATKRAFT UK LTD New Build Generating CMU Rejected SA5
Active • 2025-26 (T-4)
Loading map...
Showing 25 locations