Storage (Duration 2h)

521 unique locations (1480 components) - Page 18 of 21

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Farnham Battery Storage, Wrecclesham Hill, Farnham, GU10 4JU (1 component)

A new build 20MW battery energy storage system

Storage (Duration 2h) HARMONY FM LIMITED New Build Generating CMU Farnham ESS GU10
Inactive • 2023-24 (T-1)
7.40 MW
Farburn?Place, Dyce, Aberdeen, AB21 7GP (2 components)

Battery Storage 2 hour duration (2)

Active • 2026-27 (T-4), 2024-25 (T-1)
13.89 MW
Fairy Lane, Sale, Trafford, Greater Manchester M33 2JU (2 components)

Energy facility comprising of battery energy storage sets and ancillary equipment. (2)

Storage (Duration 2h) STOR 149 LTD New Build Generating CMU Sale Sale M33
Active • 2027-28 (T-4), 2026-27 (T-4)
38.98 MW
Emmers Farm, Holt Road, BH21 7HJ (2 components)

2h-duration battery system (2)

Storage (Duration 2h) MANNINGTON ENERGY CENTRE LIMITED New Build Generating CMU Rejected BH21
Active • 2028-29 (T-4), 2025-26 (T-1)
15.87 MW
Elvanfoot BESS, Leadhills Road, Elvanfoot, ML12 6TE (1 component)

circa 10MW 2hr lithium Ion battery system connected at 33kV to the SPT transmission system

Storage (Duration 2h) ELVANFOOT ENERGY STORAGE LIMITED New Build Generating CMU Elvanfoot 9.8 Not Prequalified ML12
Active • 2027-28 (T-4)
1.51 MW
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (2 components)

New Build Battery Storage Facility (2)

Storage (Duration 2h) SWANGATE ENERGY STORAGE LIMITED New Build Generating CMU SWANBT SWANBT S63
Active • 2025-26 (T-1), 2023-24 (T-1)
31.02 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (45 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2549.84 MW
Edwin Richards Quarry, Rowley Regis, B65 9DN (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Rowley Regis Not Prequalified B65
Active • 2026-27 (T-4)
7.09 MW
Eden Meadows, Evershill Lane, Morton CP, North East Derbyshire, DE55 6HA (1 component)

Battery Storage

Storage (Duration 2h) RWE RENEWABLES UK SOLAR AND STORAGE LIMITED New Build Generating CMU CMU_EDMB-1 Not Prequalified DE55
Active • 2028-29 (T-4)
8.14 MW
Eccles Birgham Farm TD12 4LU (9 components)
• 50MW battery storage located near to the SPT Eccles substation
• 50MW battery storage located near to the SPT Eccles substation.
• Lithium ion battery storage plant.
Storage (Duration 2h) Storage (Duration 4h) ZENOBE ECCLES LIMITED New Build Generating CMU Blackhillock extension Eccles +4 more TD12
Active • 2027-28 (T-4), 2026-27 (T-4)
171.47 MW
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
Active • 2028-29 (T-4), 2026-27 (T-4) ...
39.02 MW
Dunkeswell Power Generation Plant, Unit 24A, Flightway, Dunkeswell Business Bark, Honiton, Devon, EX14 4LG (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD (DUNKESWELL) LIMITED New Build Generating CMU Dunkeswell Not Prequalified EX14
Active • 2027-28 (T-4)
0.50 MW
Duniface Farm, Windygates, Fife, KY8 5RH (1 component)

New build Battery Energy Storage CMU

Storage (Duration 2h) BERYL STREET GENERATION LIMITED New Build Generating CMU Leven BESS KY8
Active • 2028-29 (T-4)
3.19 MW
Dunbar BESS, Dunbar, East Lothian, EH42 1RG, Scotland, UK (1 component)

Total Connection capacity of 49.99MW for Energy Storage. The component will be LFP BESS.

Storage (Duration 2h) FRV POWERTEK LIMITED New Build Generating CMU FPL Dunbar BESS EH42
Active • 2028-29 (T-4)
8.17 MW
Dounreay, Thurso KW14 7RE (2 components)
• A 34MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) REAY POWER LIMITED New Build Generating CMU Reay Reay 2 Rejected KW14
Active • 2028-29 (T-4)
21.31 MW
Dolphingstone Farm, Cockenzie, East Lothian, EH21 8GW (1 component)

The CMU component is an energy storage system comprised of lithium ion batteries with associated infrastructure

Storage (Duration 2h) BSSL EAST LOTHIAN 1 LTD New Build Generating CMU Dolphingstone Not Prequalified EH21
Active • 2028-29 (T-4)
9.21 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (60 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Dig Gate Lane, Lady House, Milnrow, Rochdale, Greater Manchester, England, OL16 4NR (2 components)
• A Distribution Connected Battery Energy Storage System.
• A Distribution Connected gas fueled generating station.
Active • 2028-29 (T-4)
10.40 MW
Denmead Farm Edneys Lane Denmead Waterlooville Hampshire PO7 6JN (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Storage (Duration 2h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU LOVEDEAN Not Prequalified PO7
Active • 2026-27 (T-4)
11.67 MW
Deep Lane BESS, Plympton, Devon, PL7 5AA (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Plympton Plympton PL7
Active • 2028-29 (T-4), 2027-28 (T-4)
4.12 MW
DB Cargo, Toton, Nottingham, NG10 1HA (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Toton Not Prequalified NG10
Active • 2027-28 (T-4)
2.24 MW
Dadglow Farm, Bishops Itchington, Southam, CV47 2SW (1 component)

A 20MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) ROOT-POWER (SOUTH) LIMITED New Build Generating CMU Dadglow Farm Not Prequalified CV47
Active • 2028-29 (T-4)
4.19 MW
Craigton Interchange, Linburn, Bishopton, Renfrewshire, Scotland, PA7 5NT, United Kingdom (3 components)

30MW/30MWh one hour battery (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.49 MW
Coxhall Power, Coxhall Road, Tattingstone, Ipswich, IP9 2NH (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Storage (Duration 2h) Storage (Duration 3h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Coxhall Power Coxhall Power IP9
Active • 2027-28 (T-4), 2026-27 (T-4)
2.28 MW
Cooklands farm, Old Snydale, Pontefract, WF7 6HA (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Cooklands Not Prequalified WF7
Active • 2028-29 (T-4)
10.47 MW
Loading map...
Showing 25 locations