Storage (Duration 2h)

513 unique locations (1469 components) - Page 2 of 21

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
• CMU ID 22NEW4, a new build battery storage CMU
• CMU ID 23NEW1, a new build battery storage CMU
• CMU ID 24NEW1, a new build battery storage CMU
Storage (Duration 2h) FIELD NEWPORT LTD New Build Generating CMU Field Newport Field Newport +2 more NP19
Active • 2026-27 (T-4), 2025-26 (T-1) ...
20.04 MW
Tyne Tunnel Industrial Estate, North Shields, Tyne & Wear, NE29 7SE (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Flatworth Not Prequalified NE29
Active • 2027-28 (T-4)
5.34 MW
Tredington Fields Farm, Claydon Solar B, Tredington, Tewkesbury, GL20 7BS (2 components)

Battery Storage (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
3.46 MW
Todrig Farm Coldstream TD12 4JA (5 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and … (2)

Storage (Duration 2h) ECCLES ENERGY CENTRE LIMITED New Build Generating CMU Eccles Energy Centre Limited Eccles Energy Centre Limited TD12
Active • 2028-29 (T-4), 2027-28 (T-4)
148.15 MW
Titchfield Lane, Wickham, Fareham PO15 6DY (3 components)

CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System) (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
32.54 MW
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (4 components)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. (2)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is currently in construction and due to be operational in Q4 ?23.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
19.62 MW
Tillingdown Lane, Caterham, CR3 7JA (2 components)
• A 12MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) ROOT-POWER (SOUTH) LIMITED New Build Generating CMU Tillingdown Tillingdown 2 Rejected CR3
Active • 2028-29 (T-4)
7.52 MW
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (2 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

Storage (Duration 2h) THORPE MARSH GREEN ENERGY HUB LIMITED New Build Generating CMU Thorpe Marsh BESS 4 Thorpe Marsh BESS 5 Not Prequalified DN6
Active • 2027-28 (T-4)
86.18 MW
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (1 component)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

Storage (Duration 2h) THORPE MARSH GREEN ENERGY HUB LIMITED New Build Generating CMU Thorpe Marsh BESS 2 Not Prequalified DN6
Active • 2027-28 (T-4)
43.09 MW
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (1 component)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

Storage (Duration 2h) THORPE MARSH GREEN ENERGY HUB LIMITED New Build Generating CMU Thorpe Marsh BESS 3 Not Prequalified DN6
Active • 2027-28 (T-4)
43.09 MW
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA (1 component)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

Storage (Duration 2h) THORPE MARSH GREEN ENERGY HUB LIMITED New Build Generating CMU Thorpe Marsh BESS 1 Not Prequalified DN6
Active • 2027-28 (T-4)
43.09 MW
The Wagon Hovel, The Borrows, Sibthorpe, Newark, NG23 5LU (1 component)

A 2 hour BESS connecting directly to the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 4 Not Prequalified NG23
Active • 2025-26 (T-1)
0.26 MW
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A gas fuelled generating station (2)
• A Battery Energy Storage System
Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) CORPOWER LIMITED New Build Generating CMU Corpower Corpower +3 more Not Prequalified SS17
Active • 2025-26 (T-4), 2024-25 (T-1)
8.21 MW
The Manorway, Stanford-le-Hope, SS17 9LL (3 components)
• A Battery Energy Storage System (2)
• Reciprocating engines of 6 mW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.74 MW
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is … (3)

Storage (Duration 2h) Open Cycle Gas Turbine (OCGT) GATEWAY ENERGY CENTRE LIMITED New Build Generating CMU Gateway Energy Centre Limited Gateway Energy Centre Limited +9 more SS17
Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
the land to the south west of Middleton Road, Middleton, Morecambe extending to approximately 3 acres (1 component) Geocoding Needed

75.00 MW of Battery Energy Storage Units with associated infrastructure.

Active • 2025-26 (T-4)
The land South-West of the Dunoon Electrical Substation located on Ardnadam Farm, Sandbank, Dunoon, Argyll and Bute, PA23 8PN (2 components)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works. (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
12.94 MW
The land at Rownall Hall Farm, Rownall Road, Wetley Rocks, Stoke-on-Trent, ST9 0BS (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 300MW, located in Stoke.

Storage (Duration 2h) C & S ENERGY LIMITED New Build Generating CMU Cellarhead BESS ST9
Active • 2027-28 (T-4)
31.54 MW
The Hollies Croft Skegness Lincolnshire PE24 4SH (1 component)

20MW-40MWh Battery Energy Storage system. Number of Inverters/skid: 6 x 3950kVA UP-XT/MVPS 4600S2 @ 25C Number of Electric combiner Box: 12 Number of battery box: 24

Storage (Duration 2h) RWE RENEWABLES UK SWINDON LIMITED New Build Generating CMU The Hollies Battery Storage Not Prequalified PE24
Active • 2025-26 (T-4)
The fields close to the Land at Little Hale Drove, Sleaford, NG34 9BG, United Kingdom (1 component)

LHBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

Storage (Duration 2h) AGR SOLAR 3 LIMITED New Build Generating CMU Not Prequalified NG34
Active • 2028-29 (T-4)
6.28 MW
The fields close to The Cottage, The Priory, Priory Lane, Little Wymondley, Hitchin, SG4 7HD (1 component)

WYBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

Storage (Duration 2h) AGR SOLAR 4 LIMITED New Build Generating CMU SG4
Active • 2028-29 (T-4)
6.28 MW
The Common, Malmesbury, SN16 9RJ (2 components)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Storage (Duration 1h) Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Malmesbury Malmesbury Not Prequalified SN16
Active • 2026-27 (T-4), 2025-26 (T-4)
7.08 MW
Templeton Farm, Birkhill, Dundee, Scotland. DD3 0QH (1 component)

A 2-hour duration containerized battery

Active • 2028-29 (T-4)
5.86 MW
Tees Dock Road Redcar and Cleveland Tees Valley England TS6 7AB (1 component)

A new build 100MW/200MWh battery storage facility connected to the Transmission network, located in Teesworks, Redcar

Storage (Duration 2h) SOUTH TEES ENERGY STORAGE LTD New Build Generating CMU South Tees BESS Not Prequalified TS6
Active • 2026-27 (T-4)
23.04 MW
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (5 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Storage (Duration 2h) CONRAD (SWINDON) LIMITED New Build Generating CMU Swindon Swindon +2 more SN3
Active • 2027-28 (T-4), 2025-26 (T-1) ...
10.59 MW
Loading map...
Showing 25 locations