Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

243 unique locations (1038 components) - Page 2 of 10

South of Carnegie Road, Liverpool, L13 3AT (1 component)

New build battery storage

Inactive •
Southmoor Lane, Havant, Hampshire, PO9 1JW (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Inactive •
South Fambridge Hall Solar Farm Fambridge Road, South Fambridge, Rochford, SS4 3LS (1 component)

20MW/40MWh of Lithium Iron Battery Electric Storage System, comprising 6 storage containers, and associated metering, switchgear and electrical infrastructure. the Battery will be its own BMU and will be co-located …

Inactive •
Smithyard Lane, Williton, TA4 4NN (5 components)

New Build CMU comprising of battery storage and associated plant

Inactive •
Slack Lane, Westhoughton, BL5 3LB (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Inactive •
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (8 components)
• 50MW of BESS to be installed within a future Greener Grid Park.
• BESS project to be installed within a future Greener Grid Park.
Inactive •
Salisbury BESS, The Avenue, Salisbury, Wiltshire, South West England, England, SP2 0BU, United Kingdom (1 component)

The CMU is a Battery Energy Storage System with a planned 49.5MW active power output, consisting of containerised batteries.

Inactive •
Rusholme Grange, Drax, YO8 8PW (6 components)
• Lithium-ion Battery Energy Storage System
• New build 35MW Battery Energy Storage System
Inactive •
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (11 components)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
Inactive •
Pyworthy, Torridge District, Devon, EX22 6LQ (1 component)

50 x 1.1MWh battery modules connected to provide 25MW max instantaneous output and 50MWh energy output per day. All batteries are class [XX]. Batteries are class 1.

Inactive •
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (15 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
Inactive •
Loading map...
Showing 25 locations