Storage (Duration 2h)

561 unique locations (1611 components) - Page 22 of 23

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
Birch Road, Colchester CO2 0EJ (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Layer 2 BESS Layer 2 BESS CO2
Active • 2027-28 (T-4), 2025-26 (T-1)
10.68 MW
Bickley Solar Farm, Bickley Solar Farm, Albrighton, Wolverhampton, WV7 3AT (1 component)

This CMU component represents the BESS system of a co-located (solar and storage) site

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Pattingham BESS WV7
Active • 2027-28 (T-4)
0.83 MW
Bengrove Farm, Base Lane, Sandhurst, Gloucestershire, GL2 9NU (1 component)

CMU ID 22BEN4, a new build battery storage CMU

Storage (Duration 2h) BENGROVE BESS LTD New Build Generating CMU Bengrove Farm Not Prequalified GL2
Active • 2026-27 (T-4)
8.66 MW
Beeston Park Farm, Ridge End Fold, Marple, Stockport, SK6 7EX (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Beeston Not Prequalified SK6
Active • 2025-26 (T-4)
6.36 MW
Basingstoke Energy Storage Facility, Basing Road, Old Basing, Basingstoke, Hampshire, RG24 7AL (3 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD (BASINGSTOKE) LIMITED New Build Generating CMU Basingstoke Basingstoke +1 more RG24
Active • 2027-28 (T-4), 2025-26 (T-1) ...
8.71 MW
Barton Hill Way, Torquay, TQ2 8JG (6 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
• New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
Storage (Duration 1h) Storage (Duration 2h) CONRAD (TORQUAY) LIMITED New Build Generating CMU Barton Hill Torquay +4 more TQ2
Active • 2026-27 (T-4), 2025-26 (T-4) ...
44.22 MW
Barleylands Barleylands Road Billericay Essex CM11 2UD (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Storage (Duration 2h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU RAYLEIGH 2 Not Prequalified CM11
Active • 2026-27 (T-4)
11.67 MW
B970, Boat of Garten, Highland, Scotland, PH24 3BY, United Kingdom (1 component)

New build 49.9MW / 99.8MWh battery energy storage system

Active • 2027-28 (T-4)
4.62 MW
Auchteraw Farm, Fort Augustus, PH32 4BT (4 components)
• New build battery storage CMU with CMU ID 22AUC4
• New build battery storage CMU with CMU ID 23AUC1
• New build battery storage CMU with CMU ID 24AUC1
Storage (Duration 2h) FIELD AUCHTERAW LTD. New Build Generating CMU FIELD AUCHTERAW FIELD AUCHTERAW +2 more PH32
Active • 2026-27 (T-4), 2025-26 (T-1) ...
49.76 MW
Ashorne Solar, Chesterton Fields Farm, Fosse Way, Ashorne Hill, CV33 9JY (1 component)

Battery Storage

Active • 2028-29 (T-4)
1.81 MW
Ashley Clinton Estate, Milford-on-Sea, Lymington, SO41 0LA (1 component)

A standalone 0.949MW BESS connected directly to the DNO network

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 2 Rejected SO41
Active • 2025-26 (T-1)
0.26 MW
Ashlett Creek, Fawley, Hampshire, SO45 1DT (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Fawley Not Prequalified SO45
Active • 2027-28 (T-4)
11.08 MW
Ash Lane, Bramley, Little London, Basingstoke and Deane, Hampshire, RG26 5FL, United Kingdom (1 component)

New build 49.995MW / 99.990MWh battery energy storage system.

Active • 2027-28 (T-4)
4.62 MW
Arran View, Jameston Farm, Dalry, North Ayrshire, KA24 4EY (1 component)

13 x 3.800MW / 7.491MWh storage units installed on designated land within a brownfield site at Jameston Farm, Dalry, North Ayrshire, KA24 4EY

Active • 2026-27 (T-4)
11.79 MW
Ardencaple Farm, Rhu, Helensburgh, Argyll & Bute, G84 8JX (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Ardencaple Rejected G84
Active • 2028-29 (T-4)
10.47 MW
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (7 components)
• Battery storage plant
• Existing generating battery storage unit.
Storage (Duration 1h) Storage (Duration 2h) ARBROATH LIMITED New Build Generating CMU Arbroath 17.5MW 2hour BESS Arbroath 17.5MW 2hour BESS +4 more DD11
Active • 2025-26 (T-4), 2024-25 (T-1) ...
34.28 MW
Aikengall 2a Wind Farm, Innerwick, EH42 1SG (2 components)

New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation.

Active • 2027-28 (T-4), 2024-25 (T-1)
18.03 MW
Aikengall 2a Wind Farm Innerwick EH42 1SG (1 component)

New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation.

Storage (Duration 2h) AIK2A SUSTAINABLE ENERGY LTD New Build Generating CMU Aikengall IIA BESS Yr 1 EH42
Active • 2024-25 (T-1)
11.34 MW
Adswood Road, Cheadle Hulme, Stockport, Greater Manchester, SK8 5QY (2 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Stockport BESS Stockport BESS Not Prequalified SK8
Active • 2028-29 (T-4), 2027-28 (T-4)
20.56 MW
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
• 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
• 75MW battery storage located near to the National Grid Stalybridge substation.
Storage (Duration 2h) Storage (Duration 4h) Zenobe Stalybridge Limited New Build Generating CMU Stalybridge Stalybridge Not Prequalified SK15
Active • 2027-28 (T-4), 2026-27 (T-4)
58.53 MW
adjacent to Kilmarnock South Substation KA1 3TN (14 components)
• 200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's
• 200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's
• Lithium ion battery storage plant
Active • 2026-27 (T-4), 2025-26 (T-1)
197.31 MW
adjacent to Kilmarnock South Substation KA1 3TN (2 components)
• 200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's
• 200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's
Storage (Duration 2h) ZENOBE KILMARNOCK SOUTH LIMITED New Build Generating CMU Kilmarnock South Not Prequalified KA1
Active • 2026-27 (T-4)
47.26 MW
Abbey Home Farm, Burford Road, Cirencester, GL7 5HF (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Abbey Not Prequalified GL7
Active • 2025-26 (T-4)
11.12 MW
Loading map...