Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

561 unique locations (1611 components) - Page 23 of 23

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
A981, Fraserburgh, Aberdeenshire, Scotland, AB43 7FW, United Kingdom (1 component)

A new build 45MW / 90MWh battery energy storage system

Active • 2027-28 (T-4)
4.16 MW
A89, Deans, West Lothian, Scotland, EH54 8TB, United Kingdom (2 components)

29.9MW/29.9MWh one hour battery

Active • 2026-27 (T-4), 2024-25 (T-1)
10.31 MW
72-77 Lower Tower Street, Hockley, Birmingham, B19 3NF (1 component)

New build battery storage

Storage (Duration 2h) VOLTARIA BES 101 LTD New Build Generating CMU Hockley B19
Active • 2028-29 (T-4)
8.90 MW
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated land within a compound at Hyde
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
39.03 MW
34 Bochum Parkway, S8 8JR (1 component)

A Distribution Connected Battery Energy Storage System

Storage (Duration 2h) JORDANTHORPE POWER LTD New Build Generating CMU Bochum Not Prequalified S8
Active • 2027-28 (T-4)
3.08 MW
322 Broomloan Rd, Glasgow G51 2JQ (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) CHECKERS ENERGY LIMITED New Build Generating CMU Checkers G51
Active • 2028-29 (T-4)
10.47 MW
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (10 components)

Battery Storage Plant

Storage Storage (Duration 1h) Storage (Duration 2h) MINETY SOUTH STORAGE 2 LTD New Build Generating CMU Minety North Storage Minety North Storage 009 +6 more SN16
Active • 2025-26 (T-4), 2024-25 (T-4) ...
125.51 MW
165 Fordhouse Lane Stirchley Birmingham B30 3AG (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Stirchley Rejected B30
Active • 2028-29 (T-4)
4.19 MW
135 CLYDESDALE PLACE, MOSS SIDE INDUSTRIAL ESTATE, LEYLAND, PR26 7QS (4 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Active • 2024-25 (T-4), 2023-24 (T-4) ...
9.68 MW
135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Glowhouse Power PR26
Active • 2025-26 (T-4)
2.01 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Reciprocating engines Storage (Duration 2h) Storage (Duration 5h) Combined Cycle Gas Turbine (CCGT) CARRINGTON STORAGE LIMITED CARLTON ENERGY NO: 5 LIMITED New Build Generating CMU Trafford Power Battery Storage Unit 1 Trafford Power Battery Storage Unit 1 +15 more M31
Active • 2027-28 (T-4), 2025-26 (T-4) ...
6769.88 MW
Loading map...
Showing 11 locations