Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

513 unique locations (1469 components) - Page 3 of 21

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Surteco UK Ltd, Widow Hill Road, Burnley, BB10 2TB (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Burnley C Not Prequalified BB10
Active • 2027-28 (T-4)
2.63 MW
St Philips Energy Storage Facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD (ST PHILIPS) LIMITED New Build Generating CMU St Philips BS2
Active • 2024-25 (T-1)
1.46 MW
St Philips energy storage facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD (ST PHILIPS) LIMITED New Build Generating CMU St Philips St Philips BS2
Active • 2028-29 (T-4), 2027-28 (T-4)
1.84 MW
St Owens Cross, Peterstow, Hereford, HR9 6AU (1 component)

A lithium-ion Energy Storage Plant

Storage (Duration 2h) ST OWENS CROSS BATTERY STORAGE LIMITED New Build Generating CMU Not Prequalified HR9
Active • 2028-29 (T-4)
7.18 MW
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JP (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.

Storage (Duration 2h) R&S ENERGY LIMITED New Build Generating CMU Waterswallows BESS SK17
Active • 2026-27 (T-4)
2.20 MW
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (2 components)
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14MW, located in Buxton
Storage (Duration 2h) R&S ENERGY LIMITED New Build Generating CMU Waterswallows BESS Waterswallows BESS SK17
Active • 2025-26 (T-1), 2024-25 (T-1)
6.34 MW
Stonehill, Charlton, Malmesbury, SN16 9RP (1 component)

49.900MW OF BATTERY ENERGY STORAGE SYSTEMS

Active • 2024-25 (T-4)
Stobhill Hospital, Fife Way, Balgrayhill, Glasgow, Glasgow City, Scotland, G21 3UW (1 component)

60MW / 120MWh BESS

Storage (Duration 2h) BLUESTONE ENERGY LTD New Build Generating CMU STOBHILL Not Prequalified G21
Active • 2026-27 (T-4)
14.18 MW
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (8 components)
• Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH. (2)
• Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.
Storage Storage (Duration 2h) Storage (Duration 0.5h) NEVENDON ENERGY STORAGE LTD New Build Generating CMU Nevendon Battery Storage Nevendon Battery Storage +2 more SS14
Active • 2025-26 (T-4), 2024-25 (T-1) ...
0.46 MW
Steam Lane, Avonmouth industrial Estate, Bristol, BS11 0YT (2 components)

20 x 1.1MWh battery modules connected to provide 10MW max instantaneous output and 20MWh energy output per day. All batteries are class [XX]. (2)

Storage (Duration 2h) AVILS CONSULTING LIMITED New Build Generating CMU Rejected BS11
Active • 2026-27 (T-4), 2023-24 (T-1)
6.05 MW
Staythorpe BESS, Staythorpe Road, Nottinghamshire, NG23 5RE (1 component)

The CMU is a Battery Energy Storage System with a planned 437MW active power output, consisting of containerised batteries.

Storage (Duration 2h) SSE UTILITY SOLUTIONS LIMITED New Build Generating CMU Staythorpe BESS Not Prequalified NG23
Active • 2027-28 (T-4)
36.01 MW
Station Road, Southfleet, Dartford, Kent, England, DA13 9PA, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Storage (Duration 2h) CSE41 Limited New Build Generating CMU Northfleet41 Not Prequalified DA13
Active • 2027-28 (T-4)
46.02 MW
Star Inn Farm, Land off the Main Street, Invergowrie, Perth and Kinross, Scotland, DD2 5EG, United Kingdom (1 component)

2 hour Battery Energy Storage System

Storage (Duration 2h) SUNSHINE PROJECT 01 LIMITED New Build Generating CMU Sunshine Project 01 Not Prequalified DD2
Active • 2027-28 (T-4)
7.68 MW
Stanely WWTW, Gleniffer Rd, Paisley, PA2 8UE (1 component)

60MW/120MWh BESS

Storage (Duration 2h) BLUESTONE ENERGY LTD New Build Generating CMU STANLEY WATER Not Prequalified PA2
Active • 2026-27 (T-4)
14.18 MW
Stammery Hill, Sector, Axminster, East Devon, Devon, England, EX13 5UH, United Kingdom (1 component)

The proposed power plant would consist of a number new highly efficient lithium-ion battery units plus ancillary equipment. Each genset is based on advanced battery technology.

Storage (Duration 2h) CSE25 Limited New Build Generating CMU Axminster25 Not Prequalified EX13
Active • 2027-28 (T-4)
22.93 MW
Speke Hall Avenue, Speke, Liverpool, L24 8DA (3 components)
• A new build, battery energy storage system (2)
• A new build, gas fueled generation station.
Reciprocating engines Storage (Duration 2h) BERYL STREET GENERATION LIMITED BAKER STREET GENERATION LIMITED New Build Generating CMU Speke BESS Speke BESS +1 more Not Prequalified L24
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.47 MW
South West side of the A444, Castle Gresley, DE11 9ES (1 component)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Active • 2026-27 (T-4)
3.13 MW
SOUTH OF NATIONAL GRID IVER SUBSTATION, SLOUGH ROAD, IVER HEATH UB8 2FX (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Iver Not Prequalified UB8
Active • 2026-27 (T-4)
7.56 MW
South of Carnegie Road, Liverpool, L13 3AT (1 component)

New build battery storage

Storage (Duration 2h) LISTER BATTERY LTD New Build Generating CMU Lister L13
Active • 2025-26 (T-4)
Southmoor Lane, Havant, Hampshire, PO9 1JW (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Havant Not Prequalified PO9
Active • 2026-27 (T-4)
7.09 MW
South Fambridge Hall Solar Farm Fambridge Road, South Fambridge, Rochford, SS4 3LS (1 component)

20MW/40MWh of Lithium Iron Battery Electric Storage System, comprising 6 storage containers, and associated metering, switchgear and electrical infrastructure. the Battery will be its own BMU and will be co-located …

Storage (Duration 2h) SOUTH FAMBRIDGE HALL SOLAR PARK LIMITED New Build Generating CMU South Fambridge Hall Solar Park Rejected SS4
Active • 2026-27 (T-4)
4.61 MW
South East of Norwich Substation, Ipswich Road, Stoke Holy Cross, South Norfolk, Norfolk, England, NR14 8PQ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Norwich Not Prequalified NR14
Active • 2026-27 (T-4)
8.98 MW
Smithyard Lane, Williton, TA4 4NN (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Watchet Watchet Not Prequalified TA4
Active • 2026-27 (T-4), 2023-24 (T-1)
7.88 MW
Smithyard Lane, Watchet, TA4 4NN (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD (WATCHET) LIMITED New Build Generating CMU Watchet TA4
Active • 2025-26 (T-1)
3.22 MW
Slack Lane, Westhoughton, BL5 3QH (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Bolton B Not Prequalified BL5
Active • 2026-27 (T-4)
4.25 MW
Loading map...
Showing 25 locations