Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

352 unique locations (1492 components) - Page 4 of 15

Hele Road, Hele, Taunton, Somerset TA4 1AH (1 component)

Energy facility comprising of battery energy storage sets and ancillary equipment.

Active • 2026-27 (T-4)
4.73 MW
High Flat Farm BESS, Adjacent to East Kilbride 33kV substation G74 4GY (1 component)

Standalone battery storage system connecting at 33kV to the East Killbride substation

Active • 2025-26 (T-1)
12.90 MW
5.08 MW
Howick Cross Lane, Howick Cross, Penwortham, Hutton, South Ribble, PR1 0NT (1 component)

Standalone battery energy storage system

Active • 2026-27 (T-4)
9.93 MW
66.82 MW
Immingham Road Stallingborough North East Lincolnshire DN41 8BS (2 components)

The construction involves the development of a Battery Storage Energy System on a site close to the grid connection point. The works involve ground works in preparation for the installation …

Active • 2028-29 (T-4)
3.24 MW
Indian Queens St Denis Cornwall PL26 8BY (1 component)

New build 47.5 MW, 95 MWh battery storage plant

Active • 2027-28 (T-4)
7.24 MW
Ipswich Road, Cardiff, CF23 9AQ (10 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2028-29 (T-4), 2026-27 (T-4) ...
41.79 MW
KIMPTON WOOD SOLAR FARM, SHODDESDEN GRANGE, GREAT SHODDESDEN, ANDOVER SP11 9LP (1 component)

This CMU component represents the BESS system of a co-located (solar and storage) site

Active • 2025-26 (T-1)
2.50 MW
Kintore, Inverurie, Aberdeenshire, AB51 0XY (4 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4), 2027-28 (T-4)
29.48 MW
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (3 components)

This is a 99.9MW battery storage facility connected at 132kV.

Active • 2026-27 (T-4), 2025-26 (T-1)
61.13 MW
Land 300M NE Of Bridge Of Dun Substation Dun Montrose (2 components)

2 hour containerised battery storage

Active • 2028-29 (T-4)
7.41 MW
Land 800m North of Suttieside Road, Forfar, Scotland, DD83NL (1 component)

2 hour Battery Energy Storage System

Active • 2028-29 (T-4)
4.36 MW
Land 90 Metres South West Of Noahs Ark Old Gallows Road Perth PH1 1QE (1 component)

2 hours Lithium-In battery storage facility in Scotland connected to the distribution network with a connection capacity of 49.4MW

Active • 2025-26 (T-1)
13.41 MW
13.54 MW
Land adjacent to Berryburn Substation Moray (2 components)

Corshellach Energy Storage Limited is planning to install a 2-hr battery storage system.

Active • 2028-29 (T-4)
7.41 MW
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (8 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• 49.9MW Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
91.06 MW
Land adjacent to Norrington Common BSP, Norrington Lane, Broughton Gifford, Melksham, SN12 8LT (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
3.59 MW
8.16 MW
Land adjacent to Taunton GSP Substation, Taunton, Somerset, TA4 1AG (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4)
24.18 MW
LAND ADJACENT TO WORMALD GREEN SUB-STATION, STATION LANE, WORMALD GREEN, HARROGATE, HG3 3RX (3 components)
• Battery Energy Storage System
• Energy Storage Site
• New Build Battery Energy Storage system
Active • 2025-26 (T-1), 2024-25 (T-1)
24.57 MW
Land adjacent to Worset Lane, Hart. TS27 3BL (2 components)

Battery Energy Storage System connecting into the Hartmoor GSP, to connect into the Transmission system via new bay.

Active • 2028-29 (T-4)
35.47 MW
Land Adjacent Unit 66 Gravelly Industrial Park Walker Dr, Birmingham B24 9AW (1 component)

The CMU is a new build 50MW/100MWh battery storage facility connected to the Western Power distribution network at 33kV, located at the Gravelly Industrial Park, Birmingham.

Active • 2026-27 (T-4)
11.58 MW
Land adjoining Outclough Farm, Chatterley, Whitfield, Biddulph Road, Stoke on Trent, ST6 8UW (1 component)

The construction of a new build Battery Energy Storage System (BESS) will comprise of a number of new Batteries supplied by Trina Storage Elementa 2.0 solution and associated equipment required …

Active • 2028-29 (T-4)
10.45 MW
Loading map...
Showing 25 locations