Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

352 unique locations (1492 components) - Page 4 of 15

Park Farm Solar and Battery, Shaftesbury Road, Gillingham, SP8 5JG (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site

Active • 2025-26 (T-1)
5.03 MW
Overlea Farm , New Mills, High Peak, Stockport SK22 4QJ (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
3.18 MW
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (9 components)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in NGED's South West region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
21.03 MW
Off Letch Lane, Stockton-on-Tees, TS21 1ED (1 component)

New Build CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
9.45 MW
North of Hull Rd, Osbaldwick, York,YO10 3JA (1 component)

New build battery storage.

Active • 2025-26 (T-4)
9.54 MW
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT (2 components)

New build two-hour duration battery storage

Active • 2026-27 (T-4)
4.16 MW
35.45 MW
New Road, Featherstone, Wolverhampton, WV10 7NS (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
9.93 MW
Newnham Road, Radwell, Baldock, North Hertfordshire, Hertfordshire, England, SG7 5DP (1 component)

A Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
10.37 MW
Newburth, Perth, Scotland, KY14 6EW (1 component)

Storage battery 2h duration

Active • 2028-29 (T-4)
13.61 MW
Netherton Farm, Keith AB55 5PE (3 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
Active • 2026-27 (T-4), 2025-26 (T-1)
54.30 MW
Mount Stamper Road, St Austell, Cornwall, PL25 5QP (2 components)

New-Build Li-Ion BESS, 2hr duration.

Active • 2028-29 (T-4)
2.09 MW
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (3 components)

The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries.

Active • 2027-28 (T-4), 2026-27 (T-4)
183.24 MW
McQuittiston Farm, A70, Ochiltree, East Ayrshire, Scotland, KA6 6NF (1 component)

A Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
6.26 MW
Mannington Depot, Telford Way, Swindon, SN5 8BA (3 components)

A Battery Energy Storage System

Inactive • 2022-23 (T-1)
Lowfields Way, Lowfields Business Park, HX5 9DA (6 components)
• New build battery storage
• New build generating storage unit
Active • 2028-29 (T-4), 2023-24 (T-1)
66.79 MW
lLand off Lincomb Lane, Lincomb, Stourport On Severn, DY13 9RB (3 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
41.46 MW
Little Raith Farm, Auchtertool, Fife, KY5 0AX (12 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-1) ...
106.91 MW
Linwood WWTW, Linwood, Paisley, PA3 3DP (1 component)

60MW/120MWh BESS

Active • 2026-27 (T-4)
14.18 MW
Link Road, Launceston, Cornwall, PL15 9LP England (8 components)
• New-Build Li-Ion BESS, 2hr duration.
• Recently-commissioned, existing Li-Ion BESS, 2hr duration.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
5.13 MW
Leylodge, Aberdeenshire, AB51 0XY (2 components)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
14.15 MW
Loading map...
Showing 25 locations