Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

521 unique locations (1480 components) - Page 4 of 21

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Slack Lane, Westhoughton, BL5 3QH (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Bolton B Not Prequalified BL5
Active • 2026-27 (T-4)
4.25 MW
Slack Lane, Westhoughton, BL5 3LB (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Bolton A Not Prequalified BL5
Active • 2026-27 (T-4)
2.13 MW
Slack Lane, Bolton, Greater Manchester, BL5 3LJ (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Bolton A Bolton A Not Prequalified BL5
Active • 2028-29 (T-4), 2027-28 (T-4)
4.01 MW
Site at Whitehill Farm, Coatbridge Road, Gartosh, G69 8DT, United Kingdom (1 component)

New build battery storage

Storage (Duration 2h) WHITEHILL BATTERY STORAGE LIMITED New Build Generating CMU Not Prequalified G69
Active • 2028-29 (T-4)
41.88 MW
Site at Raiths Industrial Estate, Kirkton Drive, Dice, Aberdeen, AB21 0BG (1 component)

New build battery storage

Storage (Duration 2h) DYCE BATTERY STORAGE LIMITED New Build Generating CMU Not Prequalified AB21
Active • 2028-29 (T-4)
10.45 MW
Shipley Road, Goffsland Farm, Shipley, Horsham, West Sussex, England, RH13 8PA, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Storage (Duration 2h) CSE43 Limited New Build Generating CMU Knepp43 Not Prequalified RH13
Active • 2027-28 (T-4)
61.41 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (5 components)
• 50MW of BESS to be installed within a future Greener Grid Park. (2)
• BESS project to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
40.07 MW
Selby, North Yorkshire, YO8 6PG (2 components)
• A 40MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 4h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Greenacres Greenacres 2 YO8
Active • 2028-29 (T-4)
25.07 MW
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.76 MW
School Lane, Bamford, Norden, Rochdale, Greater Manchester, England, OL11 5UT, (1 component)

Standalone battery energy storage system

Storage (Duration 2h) ROCHDALE (BES) LTD "DO NOT USE" New Build Generating CMU QENER3_ROCHDALE Not Prequalified OL11
Active • 2026-27 (T-4)
9.93 MW
Scawby Brook, Brigg, Lincolnshire, DN20 9LT. (3 components)

Brigg Battery 2 hour duration (3)

Storage (Duration 2h) CBS ENERGY STORAGE ASSETS UK LIMITED New Build Generating CMU 7RES31 7RES31 DN20
Active • 2028-29 (T-4), 2025-26 (T-4) ...
21.09 MW
Sanquhar II, Sanquhar, Dumfries and Galloway. DG4 6LJ (1 component)

New Build Generation CMU - Battery Energy Storage System.

Storage (Duration 2h) SANQUHAR II COMMUNITY BATTERY COMPANY LIMITED New Build Generating CMU Not Prequalified DG4
Active • 2028-29 (T-4)
18.22 MW
Sanquhar II Sanquhar Dumfries and Galloway DG4 6LF (1 component)

250 MW 2h BESS (on Day 1) that is entered at 217 MW 2h to account for degradation through 15year life.

Storage (Duration 2h) SANQUHAR II COMMUNITY BATTERY COMPANY LIMITED New Build Generating CMU Sanquhar II BESS CMU01 DG4
Active • 2027-28 (T-4)
33.40 MW
Salisbury BESS, The Avenue, Salisbury, Wiltshire, South West England, England, SP2 0BU, United Kingdom (2 components)
• The CMU is a Battery Energy Storage System with a planned 49.5MW active power output, consisting of containerised batteries.
• The CMU is a Battery Energy Storage System with a planned 49.9MW active power output, consisting of containerised batteries.
Storage (Duration 2h) SSE BATTERY SALISBURY LIMITED New Build Generating CMU Salisbury BESS Salisbury BESS SP2
Active • 2025-26 (T-4), 2024-25 (T-1)
9.98 MW
Ryton Industrial Estate Blaydon NE21 4NT (1 component)

2 hour containerised battery storage

Storage (Duration 2h) CAPELLA BESS LTD New Build Generating CMU Capella NE21
Active • 2028-29 (T-4)
10.47 MW
RYE COMMON LANE, BLUE BELL LODGE, RYE COMMON LANE, CRONDALL, FARNHAM, SURREY, GU10 5DE . (2 components)

New Build Battery Storage Site. (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
32.91 MW
RWE Generation UK plc, Cheshire Power Station North Road, Ellesmere Port Cheshire CH65 1AF (2 components)

The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel. (2)

Storage (Duration 2h) RWE GENERATION UK PLC New Build Generating CMU CMU_CHES21 CMU_CHES21 Not Prequalified CH65
Active • 2026-27 (T-4), 2025-26 (T-4)
3.55 MW
Rusholme Grange, Drax, YO8 8PW (3 components)
• New build 35MW Battery Energy Storage System (2)
• Lithium-ion Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY RH LTD New Build Generating CMU HRHL21 Rusholme BESS +1 more YO8
Active • 2025-26 (T-4), 2024-25 (T-1) ...
20.89 MW
Royle Farm, Burton upon Trent, Derbyshire, DE15 9TU (1 component)

Containerised battery storage asset, 2 hour duration

Storage (Duration 2h) ALUDRA BESS LTD New Build Generating CMU ALUDRA BESS LTD (Drakelow) DE15
Active • 2026-27 (T-4)
21.27 MW
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 003 LIMITED New Build Generating CMU Royle Barn Road Royle Barn Road +3 more Not Prequalified OL11
Active • 2026-27 (T-4), 2025-26 (T-1) ...
28.13 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (15 components)
• Gas CHP on South bank of river Humber providing electricity and industrial steam (2)
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Riversdale Way, Lemington, Newcastle upon Tyne, North of Tyne, England, NE15 8SF (1 component)

A Distribution Connected Battery Energy Storage System.

Storage (Duration 2h) NEWBURN HAUGH POWER LIMITED New Build Generating CMU Newburn NE15
Active • 2028-29 (T-4)
10.45 MW
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (6 components) Geocoding Needed
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station. (2)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
Storage Storage (Duration 2h) VATTENFALL WIND POWER LTD New Build Generating CMU Battery@Ray Battery@Ray +2 more
Active • 2024-25 (T-1), 2024-25 (T-4) ...
11.94 MW
Rawmarsh Road, Rotherham, S60 1RU (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Rotherham Not Prequalified S60
Active • 2026-27 (T-4)
2.13 MW
Loading map...
Showing 25 locations