Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

513 unique locations (1469 components) - Page 5 of 21

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Rabys Farm, Bilsborrow Lane, Bilsborrow, Preston, Lancashire, PR3 0RP (1 component)

New build battery storage

Storage (Duration 2h) LOWER 48 BARTON BESS LTD New Build Generating CMU Lower48Barton PR3
Active • 2028-29 (T-4)
9.42 MW
Pyworthy, Torridge District, Devon, EX22 6LQ (1 component)

50 x 1.1MWh battery modules connected to provide 25MW max instantaneous output and 50MWh energy output per day. All batteries are class [XX]. Batteries are class 1.

Storage (Duration 2h) AVILS CONSULTING LIMITED New Build Generating CMU Rejected EX22
Active • 2026-27 (T-4)
5.90 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
• A New Build battery energy storage system. (2)
• An existing battery energy storage system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
42.89 MW
Plot C, Land at Severn Road Avonmouth BS10 7SE (3 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (2)

Storage (Duration 2h) FPC (Ipswich) Limited New Build Generating CMU Avonmouth B1 Avonmouth B2 +1 more Not Prequalified BS10
Active • 2027-28 (T-4), 2026-27 (T-4)
27.31 MW
Plot 4A, Hurlawcrook Road, East Kilbride, Glasgow G75 0ZZ (1 component)

A distribution connected New Build Battery Energy Storage System

Storage (Duration 2h) EAST KILBRIDE PROJECT COMPANY LTD New Build Generating CMU East Kilbride Not Prequalified G75
Active • 2028-29 (T-4)
4.19 MW
Pleasance Road ? Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (5 components)

Battery storage plant (3)

Storage (Duration 1h) Storage (Duration 2h) COUPAR LIMITED New Build Generating CMU Coupar 20MW 2 hour BESS Coupar 21MW 2 hour BESS +3 more PH13
Active • 2025-26 (T-4), 2024-25 (T-1) ...
15.04 MW
8.16 MW
Pillswood Phase 2, Pillswood Farm, Dunswell Farm, Cottingham, East Riding Of Yorkshire, HU16 4JS (1 component)

LFP Battery Energy Storage facility

Storage (Duration 2h) HARMONY (PW) 2 LIMITED Existing Generating CMU PILLSWOOD 2 HU16
Active • 2024-25 (T-1)
10.88 MW
Pillswood Phase 1, Pillswood Farm, Dunswell Farm, Cottingham, East Riding Of Yorkshire, HU16 4JS (2 components)
• A 49.9MW battery energy storage system
• A battery energy storage system
Storage (Duration 2h) HARMONY (PW) LIMITED Existing Generating CMU PILLSWOOD PILLSWOOD HU16
Active • 2024-25 (T-1), 2023-24 (T-1)
29.21 MW
Pikevy Farm, Glenrothes, Fife, KY6 3HD (2 components)

This is a 49.9MW battery storage facility connected at 33kV. (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
20.72 MW
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.69 MW
Perimeter Road, Ince, Elton, Cheshire West & Chester, CH2 4RX (2 components)

A new build, battery energy storage system (2)

Storage (Duration 2h) BERYL STREET GENERATION LIMITED New Build Generating CMU Protos BESS Protos BESS CH2
Active • 2028-29 (T-4), 2027-28 (T-4)
5.47 MW
PENN CROFT FARM, FARNHAM, GU10 5PX (1 component)

A Distribution Connected Battery Energy Storage System.

Storage (Duration 2h) FLEET BESS LIMITED New Build Generating CMU Lower Larks GU10
Active • 2028-29 (T-4)
20.94 MW
Park Farm Solar and Battery, Shaftesbury Road, Gillingham, SP8 5JG (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site (2)

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Shaftesbury BESS Shaftesbury BESS SP8
Active • 2027-28 (T-4), 2025-26 (T-1)
7.09 MW
Overlea Farm , New Mills, High Peak, Stockport SK22 4QJ (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Overlea Not Prequalified SK22
Active • 2025-26 (T-4)
Overhill Farm, Rothienorman, Scotland, AB51 8YN (2 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2.5 hours.
Active • 2027-28 (T-4), 2025-26 (T-1)
23.40 MW
Ordsall Lane, Ordsall, Salford Quays, Salford, M5 3NB (2 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) WESSEX ENERGY STORAGE LTD New Build Generating CMU Not Prequalified M5
Active • 2025-26 (T-4)
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (4 components)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in NGED's South West region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
Storage (Duration 2h) ECOTRICITY (SMART GRID) LIMITED New Build Generating CMU Alveston 10MW Battery Storage Alveston 10MW Battery Storage +1 more BS35
Active • 2026-27 (T-4), 2025-26 (T-1) ...
10.98 MW
Old Bush Inn PH, Hinksford Lane, Swindon, Wall Heath, South Staffordshire, Staffordshire, West Midlands Combined Authority, England, DY6 0BA (1 component)

A Distribution Connected Battery Energy Storage System

Storage (Duration 2h) BALANCE ENERGY 21 LTD New Build Generating CMU Mile Flat Not Prequalified DY6
Active • 2028-29 (T-4)
10.37 MW
Off Letch Lane, Stockton-on-Tees, TS21 1ED (1 component)

New Build CMU comprising of battery storage and associated plant.

Storage (Duration 2h) SIRIUS ECODEV (CALIFORNIA) LIMITED New Build Generating CMU California Not Prequalified TS21
Active • 2026-27 (T-4)
9.45 MW
North Tawton, Sampford Courtenay, West Devon, Devon, England, EX20 2DA, United Kingdom (3 components)

30MW/30MWh one hour battery (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.49 MW
North of Hull Rd, Osbaldwick, York,YO10 3JA (2 components)

New build battery storage.

Storage (Duration 2h) MONETS GARDEN BATTERY LTD New Build Generating CMU Monets Monets Phase 2 YO10
Active • 2025-26 (T-4)
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT (6 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2026-27 (T-4), 2025-26 (T-4)
6.29 MW
Norrington Gate Farm, Norrington Gate, Broughton Gifford, Melksham, SN12 8LW (3 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 004 LIMITED New Build Generating CMU Norrington Gate Farm Norrington Gate Farm +1 more Rejected SN12
Active • 2026-27 (T-4)
79.82 MW
Loading map...
Showing 25 locations