Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

521 unique locations (1480 components) - Page 5 of 21

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Ravensroost Road, Minety, Malmesbury, Wiltshire, SN16 9RJ (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Malmesbury Malmesbury Not Prequalified SN16
Active • 2028-29 (T-4), 2027-28 (T-4)
13.39 MW
Rabys Farm, Bilsborrow Lane, Bilsborrow, Preston, Lancashire, PR3 0RP (1 component)

New build battery storage

Storage (Duration 2h) LOWER 48 BARTON BESS LTD New Build Generating CMU Lower48Barton PR3
Active • 2028-29 (T-4)
9.42 MW
Pyworthy, Torridge District, Devon, EX22 6LQ (1 component)

50 x 1.1MWh battery modules connected to provide 25MW max instantaneous output and 50MWh energy output per day. All batteries are class [XX]. Batteries are class 1.

Storage (Duration 2h) AVILS CONSULTING LIMITED New Build Generating CMU Rejected EX22
Active • 2026-27 (T-4)
5.90 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
• A New Build battery energy storage system. (2)
• An existing battery energy storage system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
42.89 MW
Plot C, Land at Severn Road Avonmouth BS10 7SE (3 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (2)

Storage (Duration 2h) FPC (Ipswich) Limited New Build Generating CMU Avonmouth B1 Avonmouth B2 +1 more Not Prequalified BS10
Active • 2027-28 (T-4), 2026-27 (T-4)
27.31 MW
Plot 4A, Hurlawcrook Road, East Kilbride, Glasgow G75 0ZZ (1 component)

A distribution connected New Build Battery Energy Storage System

Storage (Duration 2h) EAST KILBRIDE PROJECT COMPANY LTD New Build Generating CMU East Kilbride Not Prequalified G75
Active • 2028-29 (T-4)
4.19 MW
Plot 10 Dunnikier Business Park Midfield Drive Mitchelston Industrial Estate Kirkcaldy Fife KY1 3LW (2 components)

BATTERY STORAGE UNIT WITH 13.5 MWh energy supply and 20 MW power capacity (2)

Storage Storage (Duration 2h) Sainc Energy Limited New Build Generating CMU DPG-002 DPG-002 Rejected KY1
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Pleasance Road ? Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (5 components)

Battery storage plant (3)

Storage (Duration 1h) Storage (Duration 2h) COUPAR LIMITED New Build Generating CMU Coupar 20MW 2 hour BESS Coupar 21MW 2 hour BESS +3 more PH13
Active • 2025-26 (T-4), 2024-25 (T-1) ...
15.04 MW
8.16 MW
Pillswood Phase 2, Pillswood Farm, Dunswell Farm, Cottingham, East Riding Of Yorkshire, HU16 4JS (1 component)

LFP Battery Energy Storage facility

Storage (Duration 2h) HARMONY (PW) 2 LIMITED Existing Generating CMU PILLSWOOD 2 HU16
Active • 2024-25 (T-1)
10.88 MW
Pillswood Phase 1, Pillswood Farm, Dunswell Farm, Cottingham, East Riding Of Yorkshire, HU16 4JS (2 components)
• A 49.9MW battery energy storage system
• A battery energy storage system
Storage (Duration 2h) HARMONY (PW) LIMITED Existing Generating CMU PILLSWOOD PILLSWOOD HU16
Active • 2024-25 (T-1), 2023-24 (T-1)
29.21 MW
Pikevy Farm, Glenrothes, Fife, KY6 3HD (2 components)

This is a 49.9MW battery storage facility connected at 33kV. (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
20.72 MW
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.69 MW
Perimeter Road, Ince, Elton, Cheshire West & Chester, CH2 4RX (2 components)

A new build, battery energy storage system (2)

Storage (Duration 2h) BERYL STREET GENERATION LIMITED New Build Generating CMU Protos BESS Protos BESS CH2
Active • 2028-29 (T-4), 2027-28 (T-4)
5.47 MW
PENN CROFT FARM, FARNHAM, GU10 5PX (1 component)

A Distribution Connected Battery Energy Storage System.

Storage (Duration 2h) FLEET BESS LIMITED New Build Generating CMU Lower Larks GU10
Active • 2028-29 (T-4)
20.94 MW
Park Farm Solar and Battery, Shaftesbury Road, Gillingham, SP8 5JG (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site (2)

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Shaftesbury BESS Shaftesbury BESS SP8
Active • 2027-28 (T-4), 2025-26 (T-1)
7.09 MW
Overlea Farm , New Mills, High Peak, Stockport SK22 4QJ (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Overlea Not Prequalified SK22
Active • 2025-26 (T-4)
Overhill Farm, Rothienorman, Scotland, AB51 8YN (2 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2.5 hours.
Active • 2027-28 (T-4), 2025-26 (T-1)
23.40 MW
Ordsall Lane, Ordsall, Salford Quays, Salford, M5 3NB (2 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) WESSEX ENERGY STORAGE LTD New Build Generating CMU Not Prequalified M5
Active • 2025-26 (T-4)
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (4 components)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in NGED's South West region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
Storage (Duration 2h) ECOTRICITY (SMART GRID) LIMITED New Build Generating CMU Alveston 10MW Battery Storage Alveston 10MW Battery Storage +1 more BS35
Active • 2026-27 (T-4), 2025-26 (T-1) ...
10.98 MW
Old Bush Inn PH, Hinksford Lane, Swindon, Wall Heath, South Staffordshire, Staffordshire, West Midlands Combined Authority, England, DY6 0BA (1 component)

A Distribution Connected Battery Energy Storage System

Storage (Duration 2h) BALANCE ENERGY 21 LTD New Build Generating CMU Mile Flat Not Prequalified DY6
Active • 2028-29 (T-4)
10.37 MW
Off Letch Lane, Stockton-on-Tees, TS21 1ED (1 component)

New Build CMU comprising of battery storage and associated plant.

Storage (Duration 2h) SIRIUS ECODEV (CALIFORNIA) LIMITED New Build Generating CMU California Not Prequalified TS21
Active • 2026-27 (T-4)
9.45 MW
North Tawton, Sampford Courtenay, West Devon, Devon, England, EX20 2DA, United Kingdom (3 components)

30MW/30MWh one hour battery (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.49 MW
North of Hull Rd, Osbaldwick, York,YO10 3JA (2 components)

New build battery storage.

Storage (Duration 2h) MONETS GARDEN BATTERY LTD New Build Generating CMU Monets Monets Phase 2 YO10
Active • 2025-26 (T-4)
Loading map...
Showing 25 locations