Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

352 unique locations (1492 components) - Page 7 of 15

land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (4 components)
• Battery Storage plant
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
286.73 MW
Land At Westerton Road, Keith, Moray, AB55 5NR (3 components)

CMU 24KEI4 is a battery storage CMU.

Active • 2028-29 (T-4)
14.46 MW
Land close to Smeaton Shaw Farm, Dalkeith, EH22 2NL (1 component)

2H duration Lithium Ion Battery Storage New Build CMU.

Active • 2028-29 (T-4)
35.18 MW
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
49.98 MW
Land directly South to Coventry Substation Parrotts Grove Coventry CV2 1NQ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
LAND EAST AND WEST OF HONILEY ROAD (A4177), HONILEY, KENILWORTH, WARWICKSHIRE (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Active • 2026-27 (T-4)
11.67 MW
Land east of A981, Fraserburgh, Aberdeenshire (5 components)

12 x 3.800MW / 7.491MWh storage units installed on land adjacent to A981, Fraserburgh

Active • 2026-27 (T-4), 2023-24 (T-1)
18.67 MW
Land East of Bowbridge Lane, New Balderton, Newark, Nottinghamshire, NG24 3BY (2 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4)
8.16 MW
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (5 components)

New Build Battery Energy Storage system

Active • 2028-29 (T-4)
30.99 MW
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD. (2 components)

Lithium-based battery energy storage system

Active • 2026-27 (T-4), 2025-26 (T-1)
17.92 MW
Land lying to the east of Rectory Lane, Upton Warren, Bromsgrove, B61 7ET (1 component)

This is a 29.700 MW battery storage facility connected at 66kV.

Active • 2028-29 (T-4)
4.67 MW
Land Lying To The South Of Manor Farm, Ratcliffe On Soar, Nottingham NG11 0EA (1 component)

Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.

Active • 2027-28 (T-4)
18.47 MW
Land lying to the south west of Rouncil Lane, Kenilworth (CV8 1NN) (1 component)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Active • 2027-28 (T-4)
5.85 MW
20.94 MW
4.61 MW
Land Near To Monks House, Westerleigh, BS37 8RD (1 component)

BESS with Lit-Ion technology, 2 hours duration

Active • 2027-28 (T-4)
15.30 MW
Land Next To Bojea Farm, St Austell, PL25 5RU (1 component)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

Active • 2026-27 (T-4)
11.82 MW
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
33.32 MW
Land north east of Bustleholm Substation Painswick Close Walsall WS5 4SJ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (6 components)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Active • 2026-27 (T-4), 2025-26 (T-1) ...
36.26 MW
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
• A new build 29MW battery energy storage system
• A new build 30MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.80 MW
Loading map...
Showing 25 locations