Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

513 unique locations (1469 components) - Page 7 of 21

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Link Road, Launceston, Cornwall, PL15 9LP England (3 components)
• Recently-commissioned, existing Li-Ion BESS, 2hr duration. (2)
• New-Build Li-Ion BESS, 2hr duration.
Storage (Duration 2h) GRIDBEYOND LIMITED New Build Generating CMU PL15
Active • 2028-29 (T-4), 2025-26 (T-4) ...
1.31 MW
Leylodge, Aberdeenshire, AB51 0XY (2 components)
• New Build CMU comprising of Solar PV and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Solar Photovoltaic Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Keynesham Kintore Not Prequalified AB51
Active • 2026-27 (T-4)
8.27 MW
Leafield Battery Site, Monks Lane, Corsham SN13 9PH (4 components)

electricity storage site comprising brand new batteries, inverters and associated connection plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
7.09 MW
Latteridge Lane, Iron Acton, Tytherington, South Gloucestershire, West of England, England, BS35 3TF (2 components)

A Distribution Connected Battery Energy Storage System

Storage (Duration 2h) BALANCE ENERGY 11 LTD New Build Generating CMU Iron Acton 1 Iron Acton 2 BS35
Active • 2028-29 (T-4)
20.73 MW
LAND WITHIN HUNSHELF COMPOUND, TOFT'S LANE, OXSPRING, BARNSLEY, S36 8WR (2 components)
• New Build 25 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY HS (JV) LIMITED New Build Generating CMU Hunshelf ESS Hunshelf ESS S36
Active • 2027-28 (T-4), 2026-27 (T-4)
7.52 MW
Land West Of Slack Lane, Westhoughton, Bolton, BL5 3LB (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Bolton088 BL5
Active • 2028-29 (T-4)
6.28 MW
Land West Of Slack Lane, Westhoughton, Bolton BL5 3LB (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Bolton096 Not Prequalified BL5
Active • 2028-29 (T-4)
3.14 MW
Land west of Roman Camp Road, Calderwood Broxburn West Lothian EH52 5PF (1 component)

Standalone battery storage system connecting at 33kV to the Broxburn substation

Storage (Duration 2h) BROXBURN ENERGY STORAGE LIMITED New Build Generating CMU Broxburn EH52
Active • 2025-26 (T-1)
12.90 MW
Land West Of Kegworth Road, Ratcliffe On Soar, Nottinghamshire,NG11 0EA (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU RATCLIFFE093 Rejected NG11
Active • 2028-29 (T-4)
20.92 MW
Land West of Blackpit Lane, Awbridge Farm, Lower Penn, Wolverhampton, Staffordshire, WV4 4YA (2 components)

New Build Battery Storage site. (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
17.27 MW
27.31 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) EQUINOR WELKIN MILL LIMITED New Build Generating CMU Welkin Mill 1 Welkin Mill 1 +5 more SK6
Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.93 MW
Land to the west of Slack Lane, West Houghton, Bolton, Greater Manchester, BL5 3LJ (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Bolton B Bolton B BL5
Active • 2028-29 (T-4), 2027-28 (T-4)
8.18 MW
Land to the west of Pound Road, Axminster EX135UP (2 components)
• A 120.000 MW / 180.000 MWh battery energy storage system
• A 120.000 MW / 240.000 MWh battery energy storage system
Storage (Duration 2h) Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU AXMINSTER Axminster - Pound Rd Not Prequalified EX13
Active • 2027-28 (T-4), 2026-27 (T-4)
42.18 MW
Land To The West Of Meardsall Lane,, Swinderby,, North Kesteven, LN6 9JA (1 component)

A standalone 2 hour BESS connecting directly onto the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 3 Not Prequalified LN6
Active • 2025-26 (T-1)
0.26 MW
Land to the Westfield Farm, Town Street, Westborough, Newark, NG23 5HG (1 component)

A 2 hour BESS connecting directly to the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 4 Not Prequalified NG23
Active • 2025-26 (T-1)
0.26 MW
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (1 component)

Battery Project on Greenfield Site

Storage (Duration 2h) SIZING JOHN LIMITED New Build Generating CMU Sizing John WA9
Active • 2024-25 (T-1)
12.92 MW
Land to the south of National Grid's Rainhill substation, Lea Green Road, Rainhill WA9 4QD (1 component)

Battery project on greenfield site

Storage (Duration 2h) SIZING JOHN LIMITED New Build Generating CMU Sizing John WA9
Active • 2025-26 (T-1)
15.48 MW
LAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DR (4 components)
• A 49.9 Energy Storage System
• A Lithium Ion Battery Energy Storage System
• A Lithium Ion Energy Storage System
Storage (Duration 2h) Storage (Duration 1.5h) HEIT HP LIMITED New Build Generating CMU Hawthorn Pit Hawthorn Pit BESS +2 more SR7
Active • 2026-27 (T-4), 2025-26 (T-1) ...
46.36 MW
Land to the South of Hawkesbury Hall Farm, Parrotts Grove, Coventry, CV2 1NQ (1 component)

98 MW / 196MWh BESS

Storage (Duration 2h) BLUESTONE ENERGY LTD New Build Generating CMU HAWKESBURY HALL Not Prequalified CV2
Active • 2026-27 (T-4)
23.16 MW
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU (5 components)
• A new build 20MW battery energy storage system (2)
• A new build 19MW battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HEIT FM LIMITED New Build Generating CMU FARNHAM FARNHAM +2 more Not Prequalified GU10
Active • 2025-26 (T-4), 2024-25 (T-4) ...
LAND TO THE REAR OF HUMBERSTON SUBSTATION, HUMBERSTON, DN36 4RJ (3 components)
• New Build Battery Energy Storage system (2)
• New Build 49.9MW Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY HB (JV) LIMITED New Build Generating CMU Humberston ESS Humberston ESS +1 more Not Prequalified DN36
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.77 MW
Land to the north of Stoke Lane, Norwich, NR14 8QD (3 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.
Storage (Duration 2h) FLEXION ENERGY SPV 2 LTD FPC ELECTRIC LAND LIMITED New Build Generating CMU Norwich B1 Norwich B1 +1 more Rejected NR14
Active • 2028-29 (T-4), 2026-27 (T-4)
34.73 MW
Land To The North Of Folly Road, Deanshanger, MK19 6EY (1 component)

A 2 hour BESS connecting directly to the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 5 Not Prequalified MK19
Active • 2025-26 (T-1)
0.26 MW
Land to the north of East Howle Farm Ferryhill DL17 8SA (1 component)

2 hour containerised battery storage

Storage (Duration 2h) SPENNYMOOR ENERGY STORAGE LIMITED New Build Generating CMU Spennymoor DL17
Active • 2028-29 (T-4)
13.82 MW
Loading map...
Showing 25 locations