Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

358 unique locations (1544 components) - Page 8 of 15

Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (6 components)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Inactive •
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
• A new build 29MW battery energy storage system
• A new build 30MW battery energy storage system
Inactive •
Land northeast of Kingston Road, Slimbridge, Gloucestershire, GL27BW (1 component)

2 hour Battery Energy Storage System

Active • 2028-29 (T-4)
7.54 MW
Land North East Of Sandyforth Farm Ashton Road Billinge Wigan WN5 7XZ (1 component)

New Build Battery Storage

Active • 2028-29 (T-4)
12.15 MW
Land North East of Sandyforth Farm, Ashton Road, Wigan WN5 7XZ (2 components)

New Build Battery Storage

Active • 2028-29 (T-4)
29.02 MW
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (8 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Inactive •
Land North Of Stoke Lane Dunston Norfolk, NR14 8QD (3 components)

" Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration"

Active • 2028-29 (T-4)
29.32 MW
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (8 components)
• A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity.
• A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity.
Inactive •
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (3 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
41.84 MW
Land Off Darnall Road, Sheffield, South Yorkshire, S9 5AB (22 components)

Battery energy storage unit

Active • 2026-27 (T-4), 2028-29 (T-4)
16.74 MW
Land Off Grey Friars Way, Stafford, ST16 2PE (8 components)

Battery energy storage unit

Active • 2028-29 (T-4)
10.46 MW
Land off Hogshaw Road, Granborough, Buckingham, MK18 3NL (2 components)

Battery Storage Plant

Active • 2027-28 (T-4), 2028-29 (T-4)
181.63 MW
Land off Mansfield Road, Little Morton Farm, Little Morton, Retford, DN22 8HE (13 components)

Battery energy storage unit

Active • 2026-27 (T-4), 2027-28 (T-4) ...
14.20 MW
Land off Petre Street, Grimesthorpe, Sheffield, Yorkshire and the Humber, S4 8LU (32 components)

Battery energy storage unit

Active • 2026-27 (T-4), 2027-28 (T-4) ...
33.86 MW
Land off School Lane, Sittingbourne, Kent, ME9 8BY (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4)
5.68 MW
Loading map...
Showing 25 locations