Land north east of Bustleholm Substation Painswick Close Walsall WS5 4SJ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (6 components)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU)
Active • 2026-27 (T-4), 2025-26 (T-1) ...
36.26 MW
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
• A new build 29MW battery energy storage system
• A new build 30MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.80 MW
Land northeast of Kingston Road, Slimbridge, Gloucestershire, GL27BW (1 component)

2 hour Battery Energy Storage System

Active • 2028-29 (T-4)
7.54 MW
Land Northeast of Moat Lane, Moat Farm, Wickersley, Rotherham, S66 1DZ (3 components)

New-build energy storage asset

Active • 2028-29 (T-4)
31.41 MW
12.15 MW
Land North East of Sandyforth Farm, Ashton Road, Wigan WN5 7XZ (2 components)

New Build Battery Storage

Active • 2028-29 (T-4)
29.02 MW
Land North Of Gala Bingo, Winterton Road, Scunthorpe, DN15 0DH. (1 component)

A Battery Energy Storage System.

Active • 2027-28 (T-4)
14.62 MW
Land north of Indian Queens Substation, Domellick Hill (B3279), St Dennis, St Austell, Cornwall, PL26 8BY (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4), 2025-26 (T-1)
32.03 MW
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (8 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
12.40 MW
Land North Of Stoke Lane Dunston Norfolk, NR14 8QD (3 components)

" Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration"

Active • 2028-29 (T-4)
29.32 MW
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (8 components)
• A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity.
• A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
15.25 MW
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2027-28 (T-4), 2025-26 (T-1)
32.18 MW
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (2 components)
• New Build 2 hour battery storage system.
• New Build 2.5 hour battery storage system.
Active • 2025-26 (T-1), 2024-25 (T-1)
15.20 MW
7.68 MW
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (3 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
41.84 MW
Land Off Darnall Road, Sheffield, South Yorkshire, S9 5AB (22 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2026-27 (T-4)
16.74 MW
Land Off Grey Friars Way, Stafford, ST16 2PE (8 components)

Battery energy storage unit

Active • 2028-29 (T-4)
10.46 MW
181.63 MW
5.54 MW
19.60 MW
Land off Mansfield Road, Little Morton Farm, Little Morton, Retford, DN22 8HE (13 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.20 MW
Land off Petre Street, Grimesthorpe, Sheffield, Yorkshire and the Humber, S4 8LU (32 components)

Battery energy storage unit

Active • 2028-29 (T-4), 2027-28 (T-4) ...
33.86 MW
44.63 MW
Land off School Lane, Sittingbourne, Kent, ME9 8BY (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4)
5.68 MW