Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

Storage (Duration 2h)

499 unique locations (1595 components) - Page 8 of 20

Land South West of Indian Queens Sub-station, St Dennis, St Austell, Cornwall PL26 8BY (2 components)

47.5MW capacity system with 95MWh of batteries with all ancillary equipment to be installed on the Indian Queens site. (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
18.37 MW
Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE. (3 components)

Lithium-based battery energy storage system. (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
24.36 MW
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components)
• A new build battery energy storage system (2)
• A new build 99.9MW battery energy storage system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.77 MW
Land south of the Rayleigh Main Substation, SS11 8TZ (1 component)

New build generating battery storage unit

Active • 2028-29 (T-4)
83.76 MW
75.38 MW
Land South Of Marsh Farm Marsh Lane Fobbing Essex SS17 9JW (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Active • 2026-27 (T-4)
11.67 MW
Land South of Inglis Farm, Cockenzie, East Lothian, EH32 0JT (1 component)

New build generating storage asset

Active • 2028-29 (T-4)
20.94 MW
Land South of Church Farm, Somersham, IP8 4PN and Land East of The Channel, Burstalhill, IP8 4JL (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Active • 2026-27 (T-4)
11.67 MW
10.09 MW
Land South East of the Carrs Fishing Lakes, Letch Lane, Carlton, Stockton-on-Tees, TS21 1EA (1 component)

CMU is a 57MW/114MWh Battery Electric Storage System, which will connect to the Transmission network via a tertiary winding at the Norton 275kV substation. The Facility will comprise of 32 …

Active • 2027-28 (T-4)
5.76 MW
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
20.27 MW
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (5 components)
• A 49.5MW battery energy storage system (2)
• A 48MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land South East Of A6108, Darlington Road, Richmond, North Yorkshire, DL10 7ED (1 component)

A new build 2 hr duration Lithium-Ion Energy Storage Site

Active • 2027-28 (T-4)
4.16 MW
Land on West of St Michaels Road Widnes, WA8 8TB. (1 component)

New Build CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
1.26 MW
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (7 components)

Battery Storage Plant (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
8.56 MW
Land On The South East Side Of Medlock Road, Failsworth, Manchester M35 9WG (1 component)

A 30MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
6.28 MW
23.16 MW
Loading map...
Showing 25 locations