Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

Search Guide

This registry provides comprehensive search capabilities across all Capacity Market components:

  • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
  • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
  • CMU ID Search: Enter a specific CMU ID to find exact components
  • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

The search is intelligent and will try to determine what you're looking for based on your query.

You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

Understanding Auctions

The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

  • T-4 auctions: Held 4 years ahead of the delivery year
  • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

Search Results

Search results are grouped by location and show important details about each component:

  • Active Components with auction years 2024-25 or later
  • In-Active Components with only auction years before 2024-25
  • Company Name Click to view all components for this company
  • Technology Click to search for this technology type
  • CMU: XXX Click to search for this CMU ID
  • Auction Year Click to view details for this specific auction

Each result shows the component's capacity, location details, and participation in specific auction years.

You can sort results by relevance, location, or date using the sort options.

Pagination controls appear at the bottom when there are multiple pages of results.

Component Grouping

Components at the same location with the same description are grouped together to reduce duplication.

Each group shows:

  • All CMU IDs for components at that location
  • All auction years, sorted with newest first
  • An Active/Inactive status based on auction years

Grouping helps identify multi-year contracts and related components at the same site.

The total capacity shown combines all components in the group.

Components can be expanded to show individual details by clicking the expand icon.

Sorting and Filtering

You can sort search results by:

  • Relevance: Most relevant matches first
  • Location: Alphabetical order by location name
  • Date: By auction year (newest or oldest first)
  • Capacity: Highest or lowest capacity first

Click the column headers to change sort order.

You can filter results using the search refinements at the top of the results page:

  • Filter by technology type (e.g., only show batteries)
  • Filter by active status (show only active or inactive components)
  • Filter by auction year (show only components from specific auctions)

Map Explorer & Map View

We provide two map-based tools for exploring capacity market data:

Map Explorer

The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

  • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
  • Advanced Filtering: Filter by technology type, company, delivery year, and active status
  • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
  • Full-Screen Map: Maximizes map space for detailed geographical analysis
Search Map View

The Search Map View combines search functionality with map visualization, offering:

  • Search-First Approach: Start with text searches, then visualize results on the map
  • Integrated Results: Search results and map display work together
  • Performance Optimized: Streamlined for fast search result mapping

Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

Map Features:
  • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
    GasDSRNuclearCHPSolarWind
    BatteryBiomassHydroInterconnectorCoalOther
  • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
  • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
  • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
  • Interactive Markers: Click on individual markers to see detailed information about components at that location

Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

Contact Us

We're here to help with any questions about the Capacity Market Registry.

Email

For general inquiries and support:

For LLMs

Complete programmatic access guide for LLMs:

Loading...
Loading...
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • Trading Board

  • Buy Me A Coffee
  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Storage (Duration 2h)

    506 unique locations (1605 components) - Page 8 of 21

    All
  • Active
  • Inactive
  • Sort by: A-Z Components MW Date
    Land to North of Wey Manor Road, Addlestone, New Haw Surrey, KT15 3JR(1 component)

    Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

    BatteryStorage (Duration 2h)EL (WEST WEYBRIDGE) LIMITEDKT15
    Active • 2028-29 (T-4)
    11.94 MW
    Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET(3 components)

    This is a 49.99MW battery storage facility connected at 33kV. (3)

    BatteryStorage (Duration 2h)Storage (Duration 1.5h)ROARING HILL ENERGY STORAGE LTDKY6
    Active • 2026-27 (T-4), 2025-26 (T-1) ...
    22.04 MW
    Land South West of Indian Queens Sub-station, St Dennis, St Austell, Cornwall PL26 8BY(2 components)

    47.5MW capacity system with 95MWh of batteries with all ancillary equipment to be installed on the Indian Queens site. (2)

    BatteryStorage (Duration 2h)Storage (Duration 1.5h)SAMBAR POWER LIMITEDPL26
    Active • 2027-28 (T-4), 2025-26 (T-1)
    18.37 MW
    Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE.(3 components)

    Lithium-based battery energy storage system. (3)

    BatteryStorage (Duration 2h)Storage (Duration 1.5h)WALPOLE GREEN LIMITEDPE14
    Active • 2026-27 (T-4), 2025-26 (T-1) ...
    24.36 MW
    LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB(3 components)
    • A new build battery energy storage system (2)
    • A new build 99.9MW battery energy storage system
    BatteryStorage (Duration 2h)Storage (Duration 1.5h)HARMONY WB (JV) LIMITEDWF1
    Active • 2028-29 (T-4), 2027-28 (T-4) ...
    45.77 MW
    Land south of the Rayleigh Main Substation, SS11 8TZ(1 component)

    New build generating battery storage unit

    BatteryStorage (Duration 2h)GRESHAM HOUSE DEVCO PIPELINE LIMITEDSS11
    Active • 2028-29 (T-4)
    83.76 MW
    Land South of Staythorpe Road, Staythorpe, NG23 5RG(1 component)

    New build battery storage

    Storage (Duration 2h)ELEMENTS GREEN STAYTHORPE BESS LTDNG23
    Active • 2028-29 (T-4)
    75.38 MW
    Land South of National Grid Electricity Substation, Capenhurst Lane, Capenhurst, Chester, CH66 2HD(4 components)

    Standalone Battery Storage Asset (3)

    BatteryStorage (Duration 1h)Storage (Duration 2h)Storage (Duration 1.5h)NATIVE RIVER LTDCH66
    Active • 2026-27 (T-4), 2025-26 (T-4) ...
    25.61 MW
    Land South Of Marsh Farm Marsh Lane Fobbing Essex SS17 9JW(1 component)

    A 49.400 MW / 98.800 MWh battery energy storage system

    BatteryStorage (Duration 2h)ENSO GREEN HOLDINGS LIMITEDSS17
    Active • 2026-27 (T-4)
    11.67 MW
    Land South of Inglis Farm, Cockenzie, East Lothian, EH32 0JT(1 component)

    New build generating storage asset

    BatteryStorage (Duration 2h)COCKENZIE STORAGE LIMITEDEH32
    Active • 2028-29 (T-4)
    20.94 MW
    Land South of Church Farm, Somersham, IP8 4PN and Land East of The Channel, Burstalhill, IP8 4JL(1 component)

    A 49.400 MW / 98.800 MWh battery energy storage system

    BatteryStorage (Duration 2h)ENSO GREEN HOLDINGS LIMITEDIP8
    Active • 2026-27 (T-4)
    11.67 MW
    Land South of Barnhill Road, Macduff, Aberdeenshire, Scotland, AB44 1XY, United Kingdom,(1 component)

    New build battery storage

    Storage (Duration 2h)MACDUFF BATTERY STORAGE LIMITEDAB44
    Active • 2028-29 (T-4)
    10.09 MW
    Land South East of the Carrs Fishing Lakes, Letch Lane, Carlton, Stockton-on-Tees, TS21 1EA(1 component)

    CMU is a 57MW/114MWh Battery Electric Storage System, which will connect to the Transmission network via a tertiary winding at the Norton 275kV substation. The Facility will comprise of 32 …

    BatteryStorage (Duration 2h)MEADOW FARM BATTERY LIMITEDTS21
    Active • 2027-28 (T-4)
    5.76 MW
    Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB(4 components)

    The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

    BatteryStorage (Duration 2h)Waterswallows Energy LimitedLU4
    Active • 2026-27 (T-4), 2025-26 (T-4) ...
    20.27 MW
    Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB(5 components)
    • A 49.5MW battery energy storage system (2)
    • A 48MW battery energy storage system
    BatteryStorageStorage (Duration 2h)Storage (Duration 1.5h)HARMONY (PW) LIMITEDHU16
    Active • 2025-26 (T-4), 2024-25 (T-4) ...
    Land South East Of A6108, Darlington Road, Richmond, North Yorkshire, DL10 7ED(1 component)

    A new build 2 hr duration Lithium-Ion Energy Storage Site

    BatteryStorage (Duration 2h)HARMONY SK LIMITEDA6
    Active • 2027-28 (T-4)
    4.16 MW
    Land on West of St Michaels Road Widnes, WA8 8TB.(1 component)

    New Build CMU comprising of battery storage and associated plant.

    BatteryStorage (Duration 2h)Shell Green LtdWA8
    Active • 2026-27 (T-4)
    1.26 MW
    LAND ON THE WEST SIDE OF MAIN ROAD, GRENDON, NORTHAMPTON, NN7 1JW. (Nearest postcode to grid reference: NN7 1JB).(10 components)

    Battery Storage Plant (3)

    BatteryStorageStorage (Duration 2h)Storage (Duration 4h)GRENDON STORAGE LIMITEDNN7
    Active • 2026-27 (T-4), 2025-26 (T-4) ...
    8.98 MW
    Land on the West side of Main Road, Grendon, Northampton, NN7 1JW (Nearest postcode to grid reference: NN7 1JB).(1 component)

    Battery Storage Plant

    BatteryStorage (Duration 2h)GRENDON STORAGE LIMITEDNN7
    Active • 2025-26 (T-1)
    12.22 MW
    LAND ON THE SOUTH SIDE OF, PURLIEUS FARM, MINETY, MALMESBURY, SN16 9RP (Nearest postcode SN16 9DX)(2 components)

    Battery Storage Plant (2)

    BatteryStorageStorage (Duration 2h)MINETY SOUTH STORAGE LIMITEDSN16
    Inactive • 2022-23 (T-4), 2021-22 (T-4)
    LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (Nearest postcode to grid reference: M33 2JT).(5 components)

    Battery Storage Plant (3)

    BatteryStorageStorage (Duration 1h)Storage (Duration 2h)WEST DIDSBURY STORAGE LIMITEDM33
    Active • 2024-25 (T-4), 2023-24 (T-4) ...
    LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU.(7 components)

    Battery Storage Plant (3)

    BatteryStorage (Duration 1h)Storage (Duration 2h)WEST DIDSBURY STORAGE LIMITEDM33
    Active • 2025-26 (T-4), 2024-25 (T-1) ...
    8.56 MW
    Land on the South Side of Fairy Lane, Sale, M33 2JU(1 component)

    Battery Storage Plant

    BatteryStorage (Duration 2h)WEST DIDSBURY STORAGE LIMITEDM33
    Active • 2024-25 (T-1)
    Land On The South East Side Of Medlock Road, Failsworth, Manchester M35 9WG(1 component)

    A 30MW Distribution Connected Battery Energy Storage System

    Storage (Duration 2h)ROOT-POWER (NORTH) LIMITEDM35
    Active • 2028-29 (T-4)
    6.28 MW
    Land on the Northwest side of Barnett Wood Lane, Leatherhead, KT21 2BU(1 component)

    98MW / 196MWh BESS

    BatteryStorage (Duration 2h)BLUESTONE ENERGY LTDKT21
    Active • 2026-27 (T-4)
    23.16 MW
    Loading map...
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access