Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

Storage (Duration 2h)

506 unique locations (1605 components) - Page 9 of 21

Land at Mill Hill Substation, Partingdale Road, Barnet, NW7 1NT (3 components)

A Battery Energy Storage System. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
22.24 MW
46.96 MW
Land At Mitchells Ind Park, Barnsley, S73 8HR (12 components)

Battery energy storage unit (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
9.43 MW
Land at Monk Fryston Substation, Rawfield Lane, Leeds, LS25 5JD (3 components)
• A Battery Energy Storage System
• A Battery Energy Storage System.
• A New Build Gas fuelled power plant
Active • 2025-26 (T-4), 2024-25 (T-4)
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, ML2 0EF (4 components)
• 49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly …
• 49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.
• 49.9MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly …
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land at Nineveh Farm, Nuneham Courtenay, Oxford OX44 9PA (1 component)

Lithium-based battery energy storage system

Active • 2025-26 (T-1)
13.58 MW
Land at Oaklands Farm Featherstone Lane, Wolverhampton, Staffordshire, WV10 7JZ (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
19.09 MW
Land at Ocker Hill Substation, Power Way, Tipton, DY4 0PW (3 components)
• A Battery Energy Storage System. (2)
• A New Build Gas fuelled power plant.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.20 MW
Land at Private Road No.5, Colwick Industrial Estate, Nottingham, NG4 2JU (7 components)

Battery energy storage unit (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.65 MW
Land at Rothienorman, Badenscoth, Aberdeenshire, Scotland, AB51 8XQ (1 component)

49.9 MW Grid connection Battery Storage site.

Active • 2026-27 (T-4)
9.93 MW
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (5 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.02 MW
Land at Smith Road, Wednesbury, WS10 0PD (2 components)
• New build generating battery storage unit.
• New build generating storage unit
Active • 2028-29 (T-4)
48.64 MW
Land at Somerford Farm, SN16 9RN (4 components)
• A Battery Energy Storage System (2)
• A Battery Energy Storage System.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
58.18 MW
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
• A 7.5MW Tesla Battery Energy Storage System (2)
• Tesla Battery Energy Storage System
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.54 MW
Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (2 components)

Lithium ion battery storage system capable of charging, storing and discharging electricity. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
2.61 MW
Land at STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16MW, located in Buxton.

Active • 2025-26 (T-1)
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Active • 2024-25 (T-1)
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JP (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Active • 2026-27 (T-4)
2.48 MW
Land at Sturts Farm, Three Cross Road, West Moors, Ferndown, BH21 6QU (1 component)

98MW / 196MWh BESS

Active • 2026-27 (T-4)
23.16 MW
Land at The Magazine, Hull Road, Selby, YO8 5BJ (24 components)
• Battery energy storage unit (2)
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4)
29.76 MW
Land at the Risby Estate or in the vicinity of the Creyke Beck 400kV National Grid substation, Yorkshire, HU16 5SR (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
Land at Tuxton Farm, Plympton, Plymouth, PL7 5AA (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
7.08 MW
Land at Vause Farm, Town Lane, Charnock Richard, Chorley, PR7 5HL (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
Loading map...
Showing 25 locations