Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

358 unique locations (1544 components) - Page 9 of 15

Land close to Smeaton Shaw Farm, Dalkeith, EH22 2NL (1 component)

2H duration Lithium Ion Battery Storage New Build CMU.

Active • 2028-29 (T-4)
35.18 MW
Land At Westerton Road, Keith, Moray, AB55 5NR (3 components)

CMU 24KEI4 is a battery storage CMU.

Active • 2028-29 (T-4)
14.46 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (4 components)
• Battery Storage plant
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
Inactive •
Land at The Magazine, Hull Road, Selby, YO8 5BJ (27 components)
• Battery energy storage unit
• Battery storage unit
Active • 2027-28 (T-4), 2028-29 (T-4)
33.14 MW
Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (6 components)

Lithium ion battery storage system capable of charging, storing and discharging electricity.

Inactive •
Land at Sterte Avenue West, Poole, BH15 2AL (24 components)
• A 7 MW Battery Energy Storage System
• A 7.5MW Tesla Battery Energy Storage System
• A 7MW Battery Energy Storage System
Inactive •
Land at Smith Road, Wednesbury, WS10 0PD (4 components)
• New build generating battery storage unit.
• New build generating storage unit
Inactive •
Land at Private Road No.5, Colwick Industrial Estate, Nottingham, NG4 2JU (10 components)

Battery energy storage unit

Active • 2023-24 (T-1), 2025-26 (T-1) ...
2.68 MW
Land at Oaklands Farm Featherstone Lane, Wolverhampton, Staffordshire, WV10 7JZ (2 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4)
22.70 MW
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, ML2 0EF (5 components)
• 49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
• 49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.
Inactive •
Land At Mitchells Ind Park, Barnsley, S73 8HR (9 components)

Battery energy storage unit

Active • 2027-28 (T-4), 2028-29 (T-4)
7.13 MW
Loading map...
Showing 25 locations