Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

113 unique locations (504 components) - Page 1 of 5

Wright Street, Paisley, Renfrew, PA4 8AN (3 components)

Battery Energy Storage, 49.990 MW installed for a 2hr system.

Active • 2028-29 (T-4)
20.94 MW
West House Farm, Scruton, Northallerton, DL7 0RQ (3 components)

18MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured …

Active • 2028-29 (T-4)
7.54 MW
Westfield Road, Carlton, Wakefield, WF3 3RJ (2 components)

Battery energy storage system

Active • 2028-29 (T-4)
20.90 MW
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (4 components)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
62.68 MW
Uskmouth Power Station West Nash Road, Nash, Newport, Wales, NP18 2BZ (2 components)

AW1 Energy Storage Limited (AW1) will develop a Battery Energy Storage System (BESS) at land adjacent to the substation and will initially develop a 120 MW / 240 MWh BESS …

Active • 2028-29 (T-4)
40.20 MW
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
• CMU ID 22NEW1, a new build battery storage CMU
• CMU ID 23NEW1, a new build battery storage CMU
• CMU ID 24NEW1, a new build battery storage CMU
Active • 2023-24 (T-1), 2024-25 (T-1) ...
23.96 MW
Todrig Farm Coldstream TD12 4JA (7 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and …

Active • 2028-29 (T-4)
71.20 MW
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (2 components)

Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm.

Active • 2025-26 (T-1), 2028-29 (T-4)
10.79 MW
Tillingdown Lane, Caterham, CR3 7JA (4 components)
• A 12MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
15.04 MW
The fields close to the Land at Little Hale Drove, Sleaford, NG34 9BG, United Kingdom (3 components)

LHBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

Active • 2028-29 (T-4)
12.56 MW
The fields close to The Cottage, The Priory, Priory Lane, Little Wymondley, Hitchin, SG4 7HD (1 component)

WYBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

Active • 2028-29 (T-4)
6.28 MW
St Philips energy storage facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2028-29 (T-4)
3.48 MW
St Owens Cross, Peterstow, Hereford, HR9 6AU (2 components)

A lithium-ion Energy Storage Plant

Active • 2028-29 (T-4)
14.36 MW
Speke Hall Avenue, Speke, Liverpool, L24 8DA (1 component)

A new build, battery energy storage system

Active • 2028-29 (T-4)
3.19 MW
Slack Lane, Bolton, Greater Manchester, BL5 3LJ (4 components)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4), 2028-29 (T-4)
8.84 MW
Site at Whitehill Farm, Coatbridge Road, Gartosh, G69 8DT, United Kingdom (1 component)

New build battery storage

Active • 2028-29 (T-4)
41.88 MW
Selby, North Yorkshire, YO8 6PG (4 components)
• A 40MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
33.45 MW
Scawby Brook, Brigg, Lincolnshire, DN20 9LT. (4 components)

Brigg Battery 2 hour duration

Active • 2024-25 (T-1), 2025-26 (T-4) ...
50.74 MW
Ryton Industrial Estate Blaydon NE21 4NT (2 components)

2 hour containerised battery storage

Active • 2028-29 (T-4)
10.47 MW
Royle Barn Road, Rochdale, OL11 3DX (2 components)

Battery Energy Storage Site

Active • 2025-26 (T-1), 2025-26 (T-4)
16.49 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (10 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2022-23 (T-3), 2022-23 (T-4) ...
1165.32 MW
Riversdale Way, Lemington, Newcastle upon Tyne, North of Tyne, England, NE15 8SF (1 component)

A Distribution Connected Battery Energy Storage System.

Active • 2028-29 (T-4)
10.45 MW
Ravensroost Road, Minety, Malmesbury, Wiltshire, SN16 9RJ (4 components)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4), 2028-29 (T-4)
29.48 MW
Pikevy Farm, Glenrothes, Fife, KY6 3HD (1 component)

This is a 49.9MW battery storage facility connected at 33kV.

Active • 2025-26 (T-1)
12.82 MW
Loading map...
Showing 25 locations