Storage (Duration 3h)

11 unique locations (30 components)

4 Sidings Rd, Kirkby in Ashfield, Nottingham NG17 7JZ (2 components)

Battery energy storage unit (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
5 Foxwood Rd, Chesterfield, S41 9RA (2 components)

Battery energy storage unit (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
Albion Close, Worksop, S80 1RA (2 components)

Battery energy storage unit (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.68 MW
Common Lane, Wath upon Dearne, Rotherham, South Yorkshire, S63 7DX (5 components)
• Battery energy storage unit (2)
• New reciprocating genset in acoustic enclosure
Active • 2028-29 (T-4), 2025-26 (T-1) ...
0.69 MW
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV … (2)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2025-26 (T-1) ...
3.68 MW
Former Cascade Works, Wellington Road, Burton Upon Trent, DE14 2AP (2 components)

Battery energy storage unit (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
Fulwood Road (North), Fulwood Industrial Park, Ashfield, Nottinghamshire, NG17 2NB (2 components)

Battery energy storage unit (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
Land at Common Side Lane, Featherstone, WF7 5DF (2 components)

Battery energy storage unit (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
Land at Enterprise Court Geddington Rd, Geddington, Corby, NN18 8ES (2 components)

Battery energy storage unit (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.30 MW
Minchens Lane Bramley Tadley RG26 5BJ (4 components)
• 99.000MW Battery Energy Storage site (2)
• New Build Battery Energy Storage site
Active • 2027-28 (T-4), 2026-27 (T-4) ...
87.10 MW
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.87 MW
Loading map...
Showing 11 locations