Storage (Duration 3h)

13 unique locations (32 components)

Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (1 component)

New Build transmission connected Battery Storage site on land Adjacent to National Grid's Rainhill Substation

Active • 2028-29 (T-4)
17.82 MW
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.10 MW
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.10 MW
Land at Smith Road, Wednesbury, WS10 0PD (2 components)
• New build generating battery storage unit.
• New build generating storage unit
Active • 2028-29 (T-4)
48.64 MW
0.30 MW
0.69 MW
Former Cascade Works, Wellington Road, Burton Upon Trent, DE14 2AP (2 components)

Battery energy storage unit (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
Active • 2028-29 (T-4), 2026-27 (T-4) ...
39.02 MW
Common Lane, Wath upon Dearne, Rotherham, South Yorkshire, S63 7DX (5 components)
• Battery energy storage unit (2)
• New reciprocating genset in acoustic enclosure
Active • 2028-29 (T-4), 2025-26 (T-1) ...
0.69 MW
Albion Close, Worksop, S80 1RA (2 components)

Battery energy storage unit (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.68 MW
5 Foxwood Rd, Chesterfield, S41 9RA (2 components)

Battery energy storage unit (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
0.69 MW
Loading map...
Showing 13 locations