Storage (Duration 4h)

31 unique locations (126 components) - Page 1 of 2

Buxton Road BESS, Wormhill, Dove Holes, High Peak, Derbyshire, SK17 8DL (4 components)

New Build Battery Storage

Active • 2028-29 (T-4)
22.54 MW
Coal Aston, Dronfield, S18 3AA (4 components)
• A 45MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
37.63 MW
Eccles Birgham Farm TD12 4LU (3 components)
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
• 50MW battery storage located near to the SPT Eccles substation.
• Lithium ion battery storage plant
Active • 2026-27 (T-4), 2027-28 (T-4) ...
80.76 MW
Farr & Harris Ltd, Brassey Road, Shrewsbury, SY3 7FA (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.27 MW
Farr & Harris Ltd, Maes Y Clawdd, Maesbury Road Industrial Estate, Oswestry SY10 8NN (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.26 MW
Farr & Harris Ltd, Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown, SY16 3BD (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.26 MW
Fibden Farm, Hampton Lovett, Droitwich, Worcestershire, WR9 0NA (3 components)

New Build Storage Facility

Active • 2028-29 (T-4)
33.39 MW
Heysham Road, Bootle, L30 6TU (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.27 MW
Hollybush, Ebstree Road, Trysull, Wolverhampton, WV5 7JE United Kingdom (1 component)

BESS stand alone projec connected to 49.9MVA import/export to Penn-Wolverhampton West n2 132kV OHL (NGED). The purpose of the BESS is to provide balancing services to the local electricity grid. …

Active • 2028-29 (T-4)
7.93 MW
Land And Buildings Adjoining Saxilby Road Burton Fen LN1 2BE (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.27 MW
Land by Redgate House, Vicarage Lane Suffolk Wherstead IP9 2AF (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.16 MW
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2024-25 (T-1), 2028-29 (T-4)
0.14 MW
Land Lying To The North Of Mardyke, South Ockenden, RM15 6AP (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.26 MW
Land North of Goodrest Farm, Illey Lane, Hunnington, Halesowen, B62 0JL (3 components)

New Build storage facility

Active • 2028-29 (T-4)
58.44 MW
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2024-25 (T-1), 2028-29 (T-4)
0.59 MW
Land on the East Side of Ackholt Road, Aylesham, Canterbury CT3 3AJ (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.16 MW
Land on the North Side of Blackhorse Lane, Exeter, EX5 2FS (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.27 MW
Part Of Franklin Hodge Building, Ramsden Road, Rotherwas Industrial Estate, HR2 6LR (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.27 MW
Persley Croft, The Parkway, Aberdeen, AB22 8AN (2 components)

The proposed BESS has a capacity of up to 49.9 megawatts (MW) The proposals are likely to consist of: ? 30No. battery storage cubes ? 14No. inverters; ? 7No. transformers; …

Active • 2028-29 (T-4)
39.57 MW
Scalm Park, Wistow Common, Selby, Yorkshire, YO8 3RD (4 components)

New Build Battery Storage Facility

Active • 2028-29 (T-4)
50.09 MW
Selby, North Yorkshire, YO8 6PG (4 components)
• A 40MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
33.45 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire PA2 8UY (6 components)

BESS project to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4)
729.20 MW
Sewage Pumping Station, Rushbottom Lane, Benfleet SS7 4LW (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.27 MW
Sewage Treatment Works, Stephenson Road, Colchester Business Park, CO4 9AD (4 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1), 2028-29 (T-4)
0.27 MW
Thornton Greener Grid Park, Thornton, Melbourne, York, YO42 4RZ (5 components)

BESS project to be installed within a future Greener Grid Park.

Active • 2025-26 (T-1), 2028-29 (T-4)
55.01 MW
Loading map...
Showing 25 locations