Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 4h)

88 unique locations (472 components) - Page 3 of 4

Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.10 MW
Land on the East Side of Ackholt Road, Aylesham, Canterbury CT3 3AJ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Land on the North Side of Blackhorse Lane, Exeter, EX1 3FP (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2027-28 (T-4), 2024-25 (T-1)
0.14 MW
Land on the North Side of Blackhorse Lane, Exeter, EX5 2FS (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Lubenham Road, Market Harborough, Leicestershire, LE16 9NP *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code. (5 components)
• New reciprocating genset in acoustic enclosure
• New containerised battery storage equipment
• New reciprocating genset in acoustic enclosure
Inactive • 2022-23 (T-4), 2018-19 (T-1)
Netherton Farm, Keith AB55 5PE (12 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
124.49 MW
Off Bonnington Walk, Lockleaze, Bristol, BS7 9XF (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Old Trimpell Refinery Site Middleton Road Middleton Heysham LA3 3NT (2 components)

24 x 2MW battery storage units to be installed on designated land within a manufacturing compound on the Old Trimpell Refinery site.

Inactive • 2023-24 (T-4), 2022-23 (T-4)
Part Of Franklin Hodge Building, Ramsden Road, Rotherwas Industrial Estate, HR2 6LR (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Persley Croft, The Parkway, Aberdeen, AB22 8AN (2 components)

The proposed BESS has a capacity of up to 49.9 megawatts (MW) The proposals are likely to consist of: ? 30No. battery storage cubes ? 14No. inverters; ? 7No. transformers; …

Active • 2028-29 (T-4)
39.57 MW
Poulton Power, Unit 23, Cocker Avenue, Poulton Industrial Estate, FY6 8JU (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2025-26 (T-1)
3.88 MW
Saint Mary's Lane, Monks Farm, London Borough of Havering, London, Thurrock, Greater London, England, CM13 3EL, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Active • 2027-28 (T-4)
61.25 MW
Scalm Park, Wistow Common, Selby, Yorkshire, YO8 3RD (3 components)

New Build Battery Storage Facility

Active • 2028-29 (T-4)
50.09 MW
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.87 MW
Selby, North Yorkshire, YO8 6PG (3 components)
• A 40MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
33.45 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire PA2 8UY (4 components)

BESS project to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4)
729.20 MW
Sewage Pumping Station, Rushbottom Lane, Benfleet SS7 4LW (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Sewage Treatment Works, Chelmsford Road, Dunmow, CM6 1XG (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2027-28 (T-4), 2024-25 (T-1)
0.05 MW
Sewage Treatment Works, Stephenson Road, Colchester Business Park, CO4 9AD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Spring Lane, Gedling, Nottinghamshire, NG4 4PD (2 components)

New Build Storage Facility

Active • 2028-29 (T-4)
75.13 MW
Station Rd, Clowne, Chesterfield S43 4AB (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.27 MW
Stephenson Road, Colchester Business Park, CO4 9QP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2027-28 (T-4), 2024-25 (T-1)
0.05 MW
Tabor Avenue Reservoir, CM7 1FB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2027-28 (T-4), 2024-25 (T-1)
0.05 MW
Loading map...
Showing 25 locations