Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 4h)

89 unique locations (488 components) - Page 4 of 4

Coal Aston, Dronfield, S18 3AA (3 components)
• A 45MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
37.63 MW
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (7 components)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm

Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.46 MW
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (2 components)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm

Inactive • 2023-24 (T-1), 2022-23 (T-1)
6.23 MW
7.51 MW
Buxton Road BESS, Wormhill, Dove Holes, High Peak, Derbyshire, SK17 8DL (2 components)

New Build Battery Storage

Active • 2028-29 (T-4)
15.03 MW
Bullen Lane, Bramford, Mid Suffolk, Suffolk, England, IP8 4JH, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Active • 2027-28 (T-4)
122.81 MW
Birch House, Forge Lane, Moorlands Trading Estate, Saltash, PL12 6LX (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2025-26 (T-1)
0.16 MW
Birch House, Forge Lane, Moorlands Trading Estate, Saltash, PL12 6LX (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2025-26 (T-1)
0.11 MW
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
0.11 MW
AL4 (72 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
168.19 MW
Adjacent to National Grid Stalybridge substation SK15 3DA. (1 component)

Lithium ion battery storage plant.

Active • 2027-28 (T-4)
15.39 MW
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
• 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
• 75MW battery storage located near to the National Grid Stalybridge substation.
Active • 2027-28 (T-4), 2026-27 (T-4)
58.53 MW
adjacent to Kilmarnock South Substation KA1 3TN (14 components)

Lithium ion battery storage plant

Active • 2026-27 (T-4), 2025-26 (T-1)
176.30 MW
24a Flightway Dunkeswell Honiton EX14 4LG (8 components)
• New Build Generating CMU comprising of a battery storage asset (2)
• New Build CMU comprising of battery storage and associated plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
16.92 MW
Loading map...
Showing 14 locations