Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 5.5h)

3 unique locations (26 components)

Land off, Little Morton Farm, Little Morton, Retford, DN22 8BE (4 components)
• Battery energy storage unit
• Generating Unit 1
• To be confirmed once CMU components are known
Active • 2025-26 (T-4), 2022-23 (T-4)
19.60 MW
Excalibur Road, Beacons Park, Gorleston, Great Yarmouth, Norfolk NR31 7RQ (20 components)
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage)
• New build power station comprised of multiple reciprocating engines.
• Unit 4 Cruachan pump storage hydro plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
5.71 MW
Eggborough CRYOBattery Limited Eggborough Power, Entrance 1 Eggborough GOOLE DN14 0BS United Kingdom (2 components)

49.454 MW generator powered by cryogenic air expanded through a turbine with 250MWh of stored energy

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Loading map...
Showing 3 locations