Storage (Duration 6h)

32 unique locations (534 components) - Page 1 of 2

Wimbourne Bournemouth BH21 5EP (3 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• Water treatment centre
Inactive • 2023-24 (T-4), 2019-20 (T-1)
Warsop Energy Park, Carter Lane, Warsop Vale, NG20 8XG (28 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.07 MW
Wallingford Road, Goring, Reading, RG8 0HS (3 components)
• A 6.9MW gas fuelled generating station.
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2025-26 (T-1), 2022-23 (T-4)
12.90 MW
Vacant land, Portsdown Technology Park, Southwick Rd, Portsmouth, Hampshire, PO6 3RU (5 components)
• 20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Vacant Land off Weighbridge Rd, Deeside, Flintshire, CH5 2LF (4 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution and gas network.
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2025-26 (T-4), 2021-22 (T-4)
Unit 1-3, 135A Business Park, Armoury Road, Small Heath, Birmingham, B11 2RQ (2 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
Inactive • 2022-23 (T-4)
TBA (9 components)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
• Unproven DSR Component
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (14 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
• Ratcliffe Unit 1 coal-fired unit
Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.69 MW
Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (49 components)
• 1 x hydro turbine & synchronous generator
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
207.87 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (19 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• EV charging at residential premises
Active • 2026-27 (T-4), 2025-26 (T-1) ...
76.74 MW
Maw Green Landfill Site Maw Green Road Coppenhall Crewe Cheshire CW1 5NG (1 component)

BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)

Inactive • 2022-23 (T-4)
Mannelli House, Cowper Road, Gilwilly Industrial Estate, Penrith, CA11 9BN (6 components)
• 6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2024-25 (T-1), 2023-24 (T-4) ...
0.66 MW
Land west of Cadwell Lane, Hitchin, SG4 0AG (2 components)
• 3 X 2MW gas fuelled generators installed on a compound on land to the west of Cadwell Lane
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
Inactive • 2022-23 (T-3)
Land To The East Of Fire Station Green Lane Bishop Auckland DL14 6RS (7 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• a new build gas generating station
Active • 2025-26 (T-4), 2023-24 (T-4) ...
9.50 MW
Land East of Feckenham Substation, Astwood Lane, Feckenham B96 6HP (2 components)

New build BESS to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4), 2027-28 (T-4)
45.92 MW
Land at Woolaston Road, Park Farm Industrial Estate, Redditch, B987SG (11 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
18.60 MW
Land At Mitchells Ind Park, Barnsley, S73 8HR (10 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• Battery energy storage unit
• Component has yet to be procured.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.13 MW
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (19 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• CMU comprising of battery storage and associated plant
• New build power station comprised of multiple reciprocating engines.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
50.46 MW
Land at Fulwood Rd North, Sutton-in-Ashfield, NG17 2NB (30 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Battery storage unit
• New reciprocating gensets in acoustic enclosure
Active • 2025-26 (T-4), 2024-25 (T-4) ...
10.42 MW
land adjacent to Netherlands Way / Europa Way Stallingborough Grimsby DN41 8DT (2 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• CMU Component is 500kVA reciprocating diesel engine.
Inactive • 2022-23 (T-4), 2020-21 (T-4)
Kingsnorth, Hoo. St Werburgh, Rochester, Kent, ME3 9TX (3 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• Combined Cycle Gas Turbine plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (15 components)
• Aggregate CMU from multiple sources
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.56 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
CryoBattery One Limited, 134 Manchester Road, Carrington, M31 4AY (2 components)
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
• The project is the world?s first commercial-scale Liquid Air Energy Storage (LAES) system. The technology uses surplus electricity to condense atmospheric air into a liquid. The project has an output of 49.9 MW which can be sustained for up to six hours (300 MWh).
Active • 2028-29 (T-4), 2022-23 (T-4)
31.27 MW
CryoBattery One Limited, 134 Manchester Road, Carrington, M31 4AY (1 component)

The project is the world?s first commercial-scale Liquid Air Energy Storage (LAES) system. The technology uses surplus electricity to condense atmospheric air into a liquid. The project has an output …

Active • 2028-29 (T-4)
31.27 MW