Storage (Duration 6h)

15 unique locations (278 components)

Warsop Energy Park, Carter Lane, Warsop Vale, NG20 8XG (28 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.07 MW
Wallingford Road, Goring, Reading, RG8 0HS (3 components)
• A 6.9MW gas fuelled generating station.
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2025-26 (T-1), 2022-23 (T-4)
12.90 MW
Unit 1-3, 135A Business Park, Armoury Road, Small Heath, Birmingham, B11 2RQ (2 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
Inactive • 2022-23 (T-4)
TBA (9 components)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
• Unproven DSR Component
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (14 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
• Ratcliffe Unit 1 coal-fired unit
Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.69 MW
Maw Green Landfill Site Maw Green Road Coppenhall Crewe Cheshire CW1 5NG (1 component)

BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)

Inactive • 2022-23 (T-4)
Mannelli House, Cowper Road, Gilwilly Industrial Estate, Penrith, CA11 9BN (6 components)
• 6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2024-25 (T-1), 2023-24 (T-4) ...
0.66 MW
Land at Woolaston Road, Park Farm Industrial Estate, Redditch, B987SG (11 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
18.60 MW
Land At Mitchells Ind Park, Barnsley, S73 8HR (10 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• Battery energy storage unit
• Component has yet to be procured.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.13 MW
land adjacent to Netherlands Way / Europa Way Stallingborough Grimsby DN41 8DT (2 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• CMU Component is 500kVA reciprocating diesel engine.
Inactive • 2022-23 (T-4), 2020-21 (T-4)
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (15 components)
• Aggregate CMU from multiple sources
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.56 MW
CryoBattery One Limited, 134 Manchester Road, Carrington, M31 4AY (2 components)
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
• The project is the world?s first commercial-scale Liquid Air Energy Storage (LAES) system. The technology uses surplus electricity to condense atmospheric air into a liquid. The project has an output of 49.9 MW which can be sustained for up to six hours (300 MWh).
Active • 2028-29 (T-4), 2022-23 (T-4)
31.27 MW
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
252.48 MW
Asda Scunthorpe, Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (9 components)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on flexible electricity consuming processes
Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.73 MW
Asda Meanwood, 34 Green Road , Leeds, LS6 4JP (12 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.82 MW