Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 6h)

3 unique locations (39 components)

Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (9 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
22.63 MW
Asda Meanwood, 34 Green Road , Leeds, LS6 4JP (12 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.82 MW
133 Balornock Road, Glasgow, G21 3UW (18 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• Generators on hospital site
Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.41 MW
Loading map...
Showing 3 locations