Storage (Duration 6h)

17 unique locations (343 components)

133 Balornock Road, Glasgow, G21 3UW (18 components)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• Generators on hospital site
Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.41 MW
adjacent to Kilmarnock South Substation KA1 3TN (10 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Lithium ion battery storage plant
• To be confirmed once components are known
Active • 2026-27 (T-4), 2025-26 (T-1) ...
107.51 MW
Asda Scunthorpe, Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (9 components)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on flexible electricity consuming processes
Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.73 MW
Cleve Hill Solar Park, Seasalter Road, Graveney with Goodnestone, Swale, Kent CT5 4BP (2 components)
• A reciprocating gas engine CHP site providing hot water to a local district heating network. A solar PV installation is also installed on site, but is metered seperately to the CHP (see SLD).
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Inactive • 2023-24 (T-4), 2021-22 (T-4)
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
252.48 MW
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (15 components)
• Aggregate CMU from multiple sources
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.56 MW
Kingsnorth, Hoo. St Werburgh, Rochester, Kent, ME3 9TX (3 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• Combined Cycle Gas Turbine plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land at Fulwood Rd North, Sutton-in-Ashfield, NG17 2NB (30 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Battery storage unit
• New reciprocating gensets in acoustic enclosure
Active • 2025-26 (T-4), 2024-25 (T-4) ...
10.42 MW
Land at Woolaston Road, Park Farm Industrial Estate, Redditch, B987SG (11 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
18.60 MW
Land To The East Of Fire Station Green Lane Bishop Auckland DL14 6RS (7 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• a new build gas generating station
Active • 2025-26 (T-4), 2023-24 (T-4) ...
9.50 MW
Mannelli House, Cowper Road, Gilwilly Industrial Estate, Penrith, CA11 9BN (6 components)
• 6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2024-25 (T-1), 2023-24 (T-4) ...
0.66 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (19 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• EV charging at residential premises
Active • 2026-27 (T-4), 2025-26 (T-1) ...
76.74 MW
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (14 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
• Ratcliffe Unit 1 coal-fired unit
Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.69 MW
TBA (9 components)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
• Unproven DSR Component
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Vacant land, Portsdown Technology Park, Southwick Rd, Portsmouth, Hampshire, PO6 3RU (5 components)
• 20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Warsop Energy Park, Carter Lane, Warsop Vale, NG20 8XG (28 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.07 MW
Wimbourne Bournemouth BH21 5EP (3 components)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• Water treatment centre
Inactive • 2023-24 (T-4), 2019-20 (T-1)
Loading map...
Showing 17 locations